Laserfiche WebLink
<br />Ie <br /> <br />FIRE RESISTANCE RATINGS <br /> <br />;e <br /> <br />e <br /> <br />FIRE tSISTANCE <br /> <br />FLOOR AND CEILING CONSTRUCTIONS-Continued <br />Resistance Based on Standard Fire <br /> <br />. <br /> <br />e <br /> <br />RATINGS <br /> <br />AND PARTITIONS-Continued <br />Based on Standard Fire <br /> <br />WALLS <br />Resistance <br /> <br />Tests <br /> <br />Ratings <br /> <br />Fire <br /> <br />+' <br /> <br />Tests <br /> <br />Ratings <br /> <br />Fire <br /> <br />4~ in. slab with expanded slag aggregate. t:l <br />tection to steel reinforcement. (62-A) ,.....,..... <br />6 in. slab with air-cooled slag aggregate. 1 in. pro- <br />tection to steel reinforcement. (62- J) ............................ <br />5 in. slab with limestone aggregate, with electrical race- <br />ways and junction boxesdd. Ceiling of 1 in. (meas- <br />ured from face of lath) gypsum-vermiculite plaster on <br />metal lath supported from the bottom of the concrete <br />slab. Plaster mix: scratch coat 2 cu. ft. and brown <br />coat 3 cu. ft. U.L. listed vermiculite to 100 lbs. fibered <br />gypsum. (62-K) .....,........,......,.......................,..................,. <br />3 in. slab with limestone aggregate. Ceiling of 1 in. <br />(measured from face of lath) gypsum-vermiculitll <br />plaster on metal lath supported from the bottom of <br />the concrete slab. Plaster mix: scratch coat 2 cu. ft. <br />and brown coat 3 cu. ft. U.L. listed vermiculite to <br />100 lbs. fibered gypsum. (62-K) .....,.............................. <br />4 in. slab with limestone aggregate, with electrical race- <br />ways and junction boxesee. Ceiling of t:l in. (meas- <br />ured from face of lath) gypsum-vermiculite plaster <br />on metal lath supported not less than 11 ~ in. <br />from the bottom of the concrete slab. Plaster mix: <br />scratch coat 2 cu. ft. and brown coat 3 cu. ft. U.L. <br />listed vermiculite to 100 lbs. fibered gypsum. (62-1) <br />2 in. slab with limestone aggregate. Ceiling of t:l in. <br />(measured from face of lath) gypsum-vermiculite <br />plaster on metal lath supported not less than 13~ in. <br />from the bottom of the concrete slab. Plaster mix: <br />scratch coat 2 cu. ft. and brown coat 3 cu. ft. U.L. <br />listed vermiculite to 100 lbs. fibered gypsum. (62-1) <br />6 1 in. <br /> <br />Rating <br /> <br />4 hrs. <br /> <br />4 hrs. <br /> <br />pro- <br /> <br />in. <br /> <br />Construction <br /> <br />of <br /> <br />Details <br /> <br />Type <br /> <br />Reinforced <br />Concreteu <br /> <br />-I <br />I <br /> <br />Rating <br /> <br />Construetion <br /> <br />One side sheathed with 1 in. magnesium oxysulphate <br />wood fiber board attached to studs, 1 in. air space, <br />and 3t:l in. brick secured with metal ties to studs <br />every fifth course. Other side faced with ~ in. 1:2 <br />gypsum and sand plaster on metal lath secured directly <br />to studs. (9) <br /> <br />of <br /> <br />Details <br /> <br />Type <br /> <br />Steel Stud <br />Brick- <br />Veneered <br />Wallsz <br /> <br />4 hrs. <br /> <br />1 ~ hrs. <br /> <br />One side sheathed with ~ in. wood fiberboard sheathing <br />next to studs; t:l in. air space formed with t:l in. by <br />1% in. wood strips placed over the fiberboard and <br />secured to the studs; paper-backed wire lath nailed <br />to these strips, 3t:l in. brick veneer held in place by <br />filling t:l in. space between brick and paper-backed <br />lath with mortar. Inside facing of t:l in. neat gypsum <br />plaster on metal lath attached to 5/16 in. wood strips <br />secured to edges of the studs. (9) <br /> <br />4 hrs. <br /> <br />1~ hrs. <br /> <br />2 hrs.. <br /> <br />plaster on metal <br /> <br />gypsum <br /> <br />wood-fibered <br /> <br />~ in. unsanded, <br />lath. (7, 9) <br />1 1 <br /> <br />Steel Stud <br />Hollow <br />Partitions, <br />Plastered <br />Finished <br />each side <br />as noted <br /> <br />2 brs.. <br /> <br />sand plaster on metal lath. <br /> <br />gypsum and <br /> <br />:~ <br /> <br />~, <br /> <br />in. 1 <br />(9) <br /> <br />3 hrs. <br /> <br />. <br /> <br />. <br /> <br />2 hrs. t <br /> <br />on metal <br /> <br />1}i in. gypsum-perlite plaster on metal lath attached to <br />4 in. studs, and sufficient plaster pushed through the <br />lath to give an average total thiclmess of 1% in. <br />Plaster mix for scratch and brown coats, 100 lbs. <br />fibered gypsum to 3.7 cu. ft. perlite. (70) <br /> <br />plaster <br /> <br />gypsum <br /> <br />wood-fibered <br /> <br />in. unsanded, <br />lath. (7, 9) <br /> <br />3 hrs. <br /> <br />2 hrs.. <br /> <br />1~ in. gypsum-perlite plaster on metal lath attached to <br />4 in. studs, and sufficient plaster pushed through the <br />lath to give an average total thiclmess of 1~ in. <br />Plaster mix for scratch and brown coats, 100 lbs. <br />fibered gypsum to 4 cu. ft. perlite. (71)......,... <br /> <br />protection <br /> <br />in. slab with traprock aggregate. <br />to steel reinforcement. (62-L) <br /> <br />3 hrs. <br /> <br />3 hrs. <br /> <br />pro- <br /> <br />in. <br /> <br />in. slab with crushed limestone aggregate. <br />tection to steel reinforcement. (62-B) <br /> <br />6 <br /> <br />3 hrs. <br /> <br />pro- <br /> <br />1 <br /> <br />in. slab with calcareous gravel aggregate. <br />tection to steel reinforcement. (62-C) <br /> <br />6 <br /> <br />3 hrs. <br /> <br />pro- <br /> <br />in <br /> <br />1 <br /> <br />aggregate.. <br />(62-D) <br /> <br />in. slab with siliceous gravel <br />tection to steel reinforcement. <br /> <br />6 <br /> <br />2~ hrs. <br /> <br />pro- <br /> <br />in. <br /> <br />t:l <br /> <br />4t:l in. slab with air-cooled sl~g aggregate. <br />tection to steel reinforcement (62-M) <br /> <br />I <br />'I <br />~. <br />~ <br />f <br /> <br />2 hrs.. <br /> <br />in. gypsum-perlite plaster on metal lath attached to <br />4 in. studs, and sufficient plaster pushed through the <br />lath to give an average total thickness of 1~ in. <br />Plaster mix for scratch and brown coats, 100 lbs. <br />fibered gypsum to 3.75 cu. ft. perlite. (73)". <br /> <br />2 brs.. <br /> <br />in. (measured from face of lath) gypsum-perlite <br />plaster, on metal lath attached to 4 in. studs. Plaster <br />mix: scratch coat 2 cu. ft. and brown 3 cu. ft. of per- <br />lite to 100 lbs. fibered gypsum. (55) <br /> <br />1 <br /> <br />2 hrs. <br /> <br />t:l in. protec- <br /> <br />4t:l in. slab with trap rock aggregate. <br />tion to steel reinforcement. (62-E) <br /> <br />2 brs.. <br /> <br />wood-fibered gypsum plaster on metal <br /> <br />t:l in. unsanded, <br />lath. (7, 9) <br />1 <br /> <br />2 hrs. <br /> <br />pro- <br /> <br />in. <br /> <br />1 <br /> <br />4t:l in. slab with calcareous gravel aggregate. <br />tection to steel reinforcement. (62-F) <br /> <br />2 hrs. <br /> <br />in. <br /> <br />1 <br /> <br />4t:l in. slab with crushed limestone aggregate. <br />protection to steel reinforcement. (62-G) ......., <br /> <br />4t:l in. slab with siliceous gravel aggregate.. <br />protection to steel reinforcement. (62-H) <br /> <br />2 brs. <br /> <br />in. <br /> <br />t:l <br /> <br />br. <br /> <br />1 <br /> <br />pro- <br /> <br />t:l <br /> <br />page 47. <br /> <br />in. slab with siliceous gravel aggregate. <br />tection to steel reinforcement. (33) <br /> <br />to notes, <br /> <br />Letter superscripts refer <br />17 <br /> <br />4 <br /> <br />. <br /> <br />1~ hrs. <br /> <br />metal <br /> <br />1~ hrs.. <br /> <br />on <br /> <br />sand plaster <br /> <br />and <br /> <br />gypsum <br /> <br />:~ <br /> <br />1:~, <br />(9) <br /> <br />~ in. <br />lath. <br /> <br />of <br /> <br />in. <br /> <br />loaded not to exceed 5,120 lbs. per sq. <br /> <br />· Nonbearing. t For partitions <br />stud area the rating is 2~ hrs. <br /> <br />Letter <br /> <br />- <br /> <br />page 47. <br /> <br />refer to notes, <br /> <br />40 <br /> <br />superscripts <br />