Laserfiche WebLink
<br /> FLOOR AND CEILING CONSTRUCTIONS <br />Concrete 6 in. hollow clay tile fillers laid end to end in rows 2~ <br />and Tileu in. or more apart; reinforcing steel placed between <br /> these rows, and concrete cast around and over tile to <br /> a depth of 2 in. Ceiling plastered with ~ in. 1:3 <br /> gypsum and sand plaster. (33) '............,........."..".,"....,..., 2 hrs. <br /> 4 in. hollow clay tile fillers laid end to end in rows <br /> 2~ in. or more apart; reinforcing steel placed be- <br /> tween these rows and concrete cast around and over <br /> tile to a depth of 1~ in. Ceiling plastered with ~ in. <br /> 1:3 gypsum and sand plaster. (33) ,."..........,..""......,.... 1~ hrs. <br /> 4 in, hollow clay tile fillers laid end to end in rows 2~ <br /> in. or more apart; reinforcing steel placed between <br /> these rows and concrete cast around them and over <br /> tile to a depth of 1 ~ in. Ceiling unplastered. (33) _,.... 1 hr. <br />Gypsum 4 in. reinforced gypsum concrete slab supported on <br />,.. ._- pruperly protected fluor bea.i"iiS; li;infcrced ;~ in. <br />.:uaDU <br /> above bottom of slab; ceiling plastered with ~ in. <br /> gypsum and sand plaster. (18, 19) ...,..............,... 3 hrs. <br /> Letter superscripts refer to notes, page 47. <br /> 16 <br /> <br />. e · Nonbearing. t For partitions loaded not to exceed 5,120 Ibs. per sq. in. of <br />stud area the rating is 2~ hrs. <br />Letter superscripts refer to notes, page 47. <br /> 41 <br /> <br />~. <br /> <br />0,) <br /> <br />1~ in. (minimum thickness) U.L. listed sprayed fiber <br />applied directly to steel. Other details as speci- <br />fied in U.L. listingc, under Column Protection- <br />Design No. 4-2 HR. .............................,.,__,......,____............ <br />2~ in. plaster, two ~ in. layers 1 :1/10 :2~ (by vol- <br />ume) portland cement, lime and sand on metal lath; <br />~ in. air space between layers; no fill. (26) ."",...""", <br />~ in. 1 :2~ gypsum and sand plaster on ~ in. perforated <br />gypsum lath boxed around column and fastened with <br />wire ties. (92) ,......,...,"......,..."",...........,....,.......,................ <br />Three layers ~ in. gypsum wallboard. Inner two layers <br />cemented and clinch nailed together, cemented to col- <br />umn flanges and tied to column with double strands 18 <br />gauge tie wire at 15 in. spacing. Outer layer cemented <br />to inner layer; corners cemented and taped. (69) ........ <br />Two layers ~ in. gypsum wallboard. Inner layer <br />cemented to column flanges and tied to column with <br />double strands 18 gauge tie wire at 15 in. spacing. <br />Outer layer cemented to inner layer; corners cemented <br />and taped. (69) ',.......,..".........,".......................................,., <br />~ in. 1:3 gypsum and sand plaster or 1 in. 1 :2~ port- <br />land cement and sand plaster, on metal lath. (9) ........ <br />~ in. 1 :2~ gypsum and sand plaster, on ~ in. per- <br />forated gypsum lath boxed around column and fast- <br />ened with wire ties. (92) ............................",.'...,...",.",. <br />2 in. hollow clay tile with outside wire tiesq, with or <br />without concrete fill; ~ in. mortar between tile and <br />column. (26) ",.......,...........,"'.... <br />1 in. plaster, 1 :1/10 :2~ (by <br />ment, lime and sand on metal <br /> <br />volume) portland <br />lath; no fill. (26) <br /> <br />ce- <br /> <br />2 hrs. <br />2 hrs. <br />1 ~ hrs. <br />1~ hrs. <br />I hr. <br />1 hr. <br />1 hr. ,. <br />hr. <br />hr. <br /> <br />. <br /> <br />Steel Stud <br />Hollow <br />Partitions, <br />Plastered <br />Finished <br />each side <br />as noted <br /> <br />~ in. 2 gypsum and sand plaster on ~ in. perforated <br />gypsum lath, attached securely to 2~ in. studs by <br />special clips across lath. Abutting ends of lath secured <br />to each other with metal wire clips. Studs pressed <br />into ceiling track and fastened with two double strands <br />of tie-wires; attached to floor track with a double <br />strand of wire ties each side of track. (102) ......,......... <br />~ in. 1:2 gypsum and sand plaster on ~ in. perforated <br />gypsum lath, attached securely to 3~ in. steel studs <br />by metal clips across lath. Abutting ends of lath <br />secured to each other with metal wire clips. Studs <br />fastened to ceiling and floor tracks with two double <br />strands of tie-wire at ceiling and floor. (103) ....,.....,. <br />~ in. 1:2 gypsum and sand plaster on ~ in. perforated <br />gypsum lath attached securely to 2~ in. studs by tie <br />wires and wire clips. Abutting ends of lath secured <br />to each other with metal wire clips. Studs pressed <br />into ceiling track and fastened with two double strands <br />of tie wires; attached to floor track with a double <br />strand of wire ties on each side of track. (84) ..,......... <br />~ in. 1 :1/30 :2, I :1/30:3 portland cement, asbestos fiber <br />and sand plaster on metal lath. (9) ..........".".,...,...,...,...,... <br />~ in. 1 :2, 1:3 gypsum and sand plaster on metal lath. <br /> <br />(7, 9) .,."........,'...,.,....."......".",...",...','......."",....""......,...,..... <br />~ in. 1:2 portland cement and sand plaster in the <br />scratch coat, 1:3 gypsum and sand plaster in the <br />brown coat, on metal lath. (7) ...,......,.,.............,.."...",...., <br />~ in. I :2, 1:2 gypsum and sand plaster on metal lath. <br /> <br />(7, 9) .,..........,....,............,.........,...,'......,......,.......,.......,.......... <br />3~ in. wall (total thickness) consisting of ~ in. gyp- <br />sum and sand plaster on ~ in. U.L. listed gypsum <br />lath attached tightly to ~ in. channel frame by wire <br />ties. ~ in. channels spaced 30 in. on centers hori- <br />zontally and 5 ft. on centers vertically; tied at inter- <br />sections. Channel frame attached to ~ in. runner <br />channels at ceiling, floor and wall edge. Plaster mix: <br />scratch coat 100 Ibs., brown coat 200 Ibs. sand to <br />100 Ibs. fibered gypsum. Other details as specified in <br />U.L. Iistingc, under Walls and Partitions-Design <br /> <br />No. 10-1 HR. ............,.......,......,....,...",.......,_____......,..."........ <br />~ in. 1:1 gypsum and sand plaster on ~ in. gypsum <br />lath on steel studs providing 1 ~ in. central air <br /> <br />space. (15) ",...'........,...",."""",'.,......"..,...""...,............,...... <br />~ in. 1:2 gypsum and sand plaster on ~ in. perforated <br />gypsum lath attached securely to 334 in. studs by metal <br />clips, abutting ends of lath secured to each other with <br />metal finger cli ps. ( 46) ......"...,'...............,..,.....'.....,.......... <br /> <br />~ in. gypsum-perlite plaster on ~ in. perforated gypsum <br />lath attached securely to 4 in. studs by metal clips and <br />with abutting ends of lath secured to each other with <br />metal finger clips. Plaster mix for scratch and brown <br />coats, 100 Ibs. gypsum to 2~ cu. ft. perlite. (48) ,....... <br /> <br />Type <br /> <br />Steel <br />Columns <br /> <br />'_ <br />FIRE RESISTANCE RATINGS <br />COLUMN PROTECTIONS-Continued <br />Fire Resistance Ratings Based on Standard Fire Tests <br />- <br />Details of Construction Rating <br /> <br />. <br /> <br />e <br /> <br />~ <br /> <br />,~ <br /> <br />.' <br /> <br />e <br /> <br />Type <br /> <br />Details <br /> <br />. <br />FIRE RESISTANCE RATINGS <br /> <br />WALLS AND PARTITIONS-Continued <br />Fire Resistance Ratings Based on Standard Fire Tests <br /> <br />of <br /> <br />Protection <br /> <br />Rating <br />- <br />I~ hrs.. <br />1~ hrs.* <br />1~ hrs.* <br />1 hr.* <br />1 hr. <br />I hr.. <br />I hr. <br />1 hr.. <br />1 hr.. <br />I hr.. <br />1 hr.. <br />