Laserfiche WebLink
<br />1~ in. gypsum-vermiculite plaster on two layers ~ in. <br />perforated gypsum lath boxed around column and <br />fastened with wire ties. Plaster mix: 2~ cu. ft. <br />U.L. listed vermiculite plaster aggregate to 100 Ibs. <br />fibered gypsum. Other details as specified in U.L. list- <br />ingc, under Column Protection-Design No. 5-3 HR. <br /> <br />1~ in. (measured from face of lath) U.L. listed ce- <br />ment 'and plaster mixture on ~ in. ribbed metal lath <br />vv"rapped :.round column. ~rc fi!!. Other det:li!~ :!os <br />specified in U.L. listingc, under Column Protection- <br />Design No. 2-3 HR <br /> <br />Letter <br /> <br />14 <br /> <br />43 <br /> <br />to notes, <br /> <br />page 47. <br /> <br />superscripts <br /> <br />refer <br /> <br />to notes, <br /> <br />page 47. <br /> <br />3 hrs. <br /> <br />. <br /> <br />e <br /> <br />· Nonbearing. <br /> <br />~ in. gypsum-vermiculite plaster on metal lath. <br />Plaster mix: scratch coat 2 to 2~ cu. ft. and <br />brown coat 3 to 3~ cu. ft. U.L. listed vermiculite <br />plaster aggregate to 100 Ibs. fibered gypsum. Other <br />details as sDecified in U.L. listinJlC. under Walls <br />and Partitions-Design No. 3-1 HR. <br /> <br />Letter superscripts refer <br /> <br />1 <br /> <br />hr. <br /> <br />3 hrs. <br /> <br />1 in. (measured from face of lath) gypsum-vermicu- <br />lite plaster on metal lath spaced 1 ~ in. from column <br />with plaster pushed through to column flanges. PIas- <br />ter mix: scratch coat 2 to 2~ cu. ft. and brown coat <br />3 to 3~ cu. ft. U.L. listed vermiculite plaster aggre- <br />gate to 100 lb. fibered gypsum. No fill. Other details <br />as specified in U.L. listingc, under Column Protec- <br />tion-Design No. 1-3 HR <br /> <br />3 hrs. <br /> <br />l.J: <br /> <br />I.. <br /> <br />~ in. 1 :2, 1:3 gypsum and sand plaster on wood <br />lath; stud spaces filled with mineral wool. (7, 9).... <br /> <br />~ in. 1 :2, 1:2 gypsum and sand plaster on ~ in. <br />flame-proofed fiberboard plaster base. (7, 9) .,....'". <br /> <br />~ in. 1:2 gypsum and sand plaster on ~ in. per- <br />forated gypsum lath, one ~ in. diam. hole or <br />larger for each 16 SQ. in. of lath. (7, 9).".,...,....,...... <br /> <br />~ in. unsanded, wood-fibered gypsum plaster on <br />~ in. plain gypsum lath. (9) "........................,...."..... <br /> <br />~ in. plaster, on metal lath attached to studs. Plaster <br />mix for scratch and brown coats, 1:2 fibered <br />gypsum plaster and pumice aggregate containing <br />air entraining agent. (76) <br /> <br />1 <br /> <br />hr. <br /> <br />1 <br /> <br />1 <br /> <br />hr. <br /> <br />hr. <br /> <br />1 <br /> <br />hr. <br /> <br />1 in. (measured from face of lath) gypsum-perlite <br />plaster on metal lath spaced 1~ in. from column with <br />plaster pushed through to column flanges. Plaster mix: <br />3 cu. ft. U.L. listed perlite plaster aggregate to 100 <br />Ibs. fibered gypsum. No fill. Other details as specified <br />in U.L. listingc, under Column Protection-Design <br />No. 4-3 HR <br /> <br />3 hrs. <br /> <br />~ in. 1 :1~, 1:3 gypsum and sand plaster on ~ in. <br />diamond mesh expanded metal lath of 26 U. S. <br />gauge attached by 1~ in. 4-penny nails 6 in. apart <br />or by equivalent staples. Studs 2 x 2 in. if non- <br />bearing. (10) <br /> <br />1 <br /> <br />hr. <br /> <br />hr. <br /> <br />in. (measured from face of lath) gypsum-perlite <br />plaster on metal lath spaced 1~ in. from column, <br />with plaster pushed through to column flanges. <br />Plaster mix: scratch coat 2 cu. ft. and brown coat <br />3 cu. ft. U.L. listed perlite plaster aggregate to 100 <br />lb. fibered gypsum. No fill. Other details as speci- <br />fied in U.L. listingc, under Column Protection- <br />Design No. 3-3 HR <br /> <br />3 hrs. <br /> <br />~ in. gypsum-vermiculite plaster on ~ in. per- <br />forated gypsum lath. Plaster mix, 2~ cu. ft. <br />vermiculite to 100 lbs. fibered gypsum. (50).,........ <br /> <br />1 hr. or <br />1~ hrs.. <br /> <br />. <br /> <br />.' <br /> <br />~ in. gypsum-perlite plaster on ~ in. perforated <br />gypsum lath; plaster mix: 2~ cu. ft. perlite to 100 <br />Ibs. fibered gypsum. (49) <br /> <br />1 hr. or <br />1~ hrs.. <br /> <br />2 in. hollow clay tile with outside wire tiesq or with <br />~ in. metal mesh in horizontal joints; limestone or <br />trap rock concrete fill, extending 1 in. outside column <br />on all sides. (26) <br /> <br />3 hrs. <br /> <br />Wood Stud <br />Partitions, <br />Plastered <br />Studs2x4 <br />in. or larger. <br />Finished <br />each side <br />as noted <br /> <br />~ in. unsanded, wood-fibered gypsum <br />metal lath. (7, 9) "......,'....,...,................ <br /> <br />~ in. 1 :2, 1:3 gypsum and sand plaster on metal <br />lath: stud spaces filled with mineral wool. (9) <br /> <br />1 :2, 1:2 gypsum and sand plaster on meta <br />stud spaces filled with mineral wool. (7, 9) <br /> <br />on <br /> <br />plaster <br /> <br />1~ hrs. <br /> <br />1~ <br /> <br />MS. <br /> <br />in. gypsum and sand plaster on ~ in. perforated gyp- <br />sum lath boxed around column and fastened with wire <br />ties. Plaster mix: scratch coat 200 lbs. and brown <br />coat 300 Ibs. sand to 100 Ibs. fibered gypsum. (90) ...... <br /> <br />3 hrs, <br /> <br />~ in. <br />lath <br /> <br />in. unsanded, wood fibered gypsum plaster on metal <br />lath. (9) <br /> <br />1~ hrs. <br /> <br />bb2 hrs.. <br /> <br />2 <br /> <br />1~ in. (measured from face of lath) gypsum-perlite <br />plaster on self-furring metal lath. Plaster mix: <br />scratch coat 2 cu. ft. and brown coat 3 cu. ft. of <br />perlite to 100 Ibs. fibered gypsum. Other details as <br />specified in U.L. listingc, under Column Protection- <br />Design No. 6-3 HR <br /> <br />3 <br /> <br />:lrs. <br /> <br />5/32 in. cement-asbestos shingles laid over 14 lb. per <br />100 SQ. ft. asbestos felt over ~ in, wood sheathing <br />on one side; 4 in. strips of ~ in. gypsum board <br />over edges of studs under facing of 3/16 in. cement <br />asbestos board on other side; filling of mineral <br />wool bats. (9) <br /> <br />1 <br /> <br />hr. <br /> <br />1~ in. gypsum-perlite plaster on ~ in. perforated <br />gypsum lath boxed around column and fastened with <br />wire ties. Plaster mix: scratch coat 2 cu. ft. and <br />brown coat 3 cu. ft. perlite to 100 Ibs. fibered gypsum. <br />(92) <br /> <br />3 hrs. <br /> <br />Wood Stud <br />Exterior <br />Walls <br />Studs2x4 <br />in.orlarger. <br /> <br />One side sheathed with ~ in. gypsum sheathing <br />covered with wood drop siding; other side faced <br />with ~ in. 1:2 gypsum and sand plaster on ~ in. <br />perforated gypsum lath. (39) <br /> <br />I <br /> <br />hr. <br /> <br />Type <br /> <br />Steel <br />Columns <br /> <br />Details <br /> <br />COL UMN PROTECTIONS-Continued <br />Fire Resistance Based on Standard Fire Tests <br /> <br />Ratings <br /> <br />of <br /> <br />Protection <br /> <br />Rating <br /> <br />. <br /> <br />. <br /> <br />Type <br /> <br />Fire <br /> <br />WALLS <br />Resistance <br /> <br />Details <br /> <br />AND PARTITIONS-Continued <br />Based on Standard Fire <br /> <br />of <br /> <br />Ratings <br /> <br />Construction <br /> <br />Tests <br /> <br />Rating <br /> <br />e <br /> <br />FIRE RESISTANCE <br /> <br />RATINGS <br /> <br />e <br /> <br />e <br /> <br />FIRE RESISTANCEt.TINGS <br />