Laserfiche WebLink
d. All corners of the subdivision, all angle points and points of curvature in the subdivision <br />boundary, all block corners, all angle points and points of curvature in each street right of way <br />shall be marked with iron rod not less than three fourths (3/4) of an inch in diameter and thirty <br />(30) inches in length, placed flush with the finished ground elevation. <br />e. All lot corners shall be marked with iron rods not less than five -eights (5/8) of an inch in <br />diameter and thirty (30) inches in length, placed flush with the finished ground elevation. <br />f. All required monumentation shall be completed prior to final acceptance of the subdivision <br />and execution of the Plat. <br />(2) Major developments <br />a. Permanent control monuments, one for each five acres of property or fraction thereof, shall <br />be placed along street centerlines or at corners of the development. The location of control <br />monuments shall be approved by the Department and shown on the Development Site Plan. <br />The construction of permanent control monuments shall be in accordance with the PICM. <br />b. At least one control monument shall be accurately tied, by angle and distance to an approved <br />City of La Porte monument. Elevations shall be established for each control monument <br />installed. Datum shall be supplied or approved by the Department. <br />c. Elevation and coordinate values for each control monument shall be submitted and approved <br />by the Department prior to or concurrent with acceptance of all public improvements. <br />d. All lot corners within the Development shall be marked with iron rods not less than five - <br />eights (5/8) of an inch in diameter and thirty (30) inches in length, placed flush with the finished <br />ground elevation prior to commencement of any building construction. <br />(3) Minor developments <br />a. All lot corners of Minor Developments shall be marked with iron rods not less than five - <br />eights (5/8) of an inch in diameter and thirty (30) inches in length, placed flush with the finished <br />ground elevation. Lot corners shall be established and placed prior to commencement of any <br />building construction. <br />(h) Public improvements <br />(1) The developer shall pay all costs for providing the development with streets, water mains, <br />sanitary sewers, and storm sewers in accordance with plane and specifications for such <br />improvement approved by the Director and in the manner set out in the adopted Utility Extension <br />Policy. The subdivider shall pay all costs associated with street lighting as set out in the PICM. <br />(2) The subdivider or developer shall guarantee construction of all approved public improvements <br />as provided in this section and in conformance with the adopted PICM. <br />(3) The installation of the approved improvements shall be under the inspection of the Director or <br />his representative and the Director shall certify the installation as being in accordance with the <br />26 <br />Thursday, June 09, 2016 <br />