My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1993-1892
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1993
>
O-1993-1892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:53 PM
Creation date
10/25/2006 12:59:07 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/1/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />Engineering Services Agreement - Page 2 <br /> <br />Item 3. <br /> <br />Construct Medium Intensity Runway and Taxiway Light"ing <br /> <br />a. Extend MIRL 200 feet north on Runway 12-30. <br />b. Extend MITL 200 feet north on Taxiway 12-30. <br />c. Extend lighting 600 feet south on Runway 12-30. <br />d. Extend MITL 600 feet south on Taxiway 12-30. <br />e. Relocate existing threshold lights on Runway 12-30. <br />f. Remove existing overhead power lines on southern end of Runway 12-30 and <br />relocate underground for obstruction removal. <br />g. Beacon. <br />h. Lighted wind cone. <br /> <br />Construct Localizer/DME and install AWOS System <br /> <br />Item 4. <br /> <br />The extent of the Project will be in general compliance with final FAA allocations with a construction <br />budget of approximately $1,774,000.00. <br /> <br />SECfION 2 <br /> <br />A. Basic Services <br /> <br />The Basic Services in this Contract are divided into three distinct phases; Phase I - Preliminary Design; <br />Phase II - Final Design; Phase IIJ - Construction. The Engineer shall perform the services required for each <br />Phase of this Contract only upon receipt of written notice of acceptance of the preceding Phase and written <br />authorization by the Director of Public Works to commence Engineer's performance of services for that specific <br />Phase and that adequate funds have been allocated for that Phase. The Engineer understands and acknowledges <br />that the City may determine not to proceed with this Contract after completion of the Engineer's services for <br />either Phase I - Preliminary Design or Phase II - Final Design. In such event, the City Manager shall provide <br />the Engineer with a written notice of his intent to terminate this Contract as provided in Article XI. <br /> <br />The Engineer agrees to perform the services set forth below for each applicable Phase authorized by <br />the Director of Public Works. In addition, the Engineer agrees to perform such specific tasks as are set forth <br />in Section I. Provided, however, in the event of an inconsistency between the terms of this Section and the terms <br />of Section I, the terms of Section I shall control. <br /> <br />(a) Phase I - Preliminary Design. The Engineer shall submit to the Director of Public Works within <br />five (5) days of the Notice to Proceed with Phase I, the Project Schedule Chart reflecting firm dates for the <br />beginning and end of each activity set forth therein and the review dates for such activities. The Engineer shall <br />prepare for approval by the Director of Public Works the preliminary engineering studies, and designs for the <br />Project. Such studies and designs shall consist of preliminary layouts, sketches, recommended final design <br />criteria, outline specifications, reports and cost estimates. The report shall be prepared in sufficient detail so <br />as to (i) clearly indicate anticipated problems; (ii) recommend the alternate solutions to the problems; (ill) <br />identify the possible "alternate" bid items for the Project recommended by the Engineer and the Director of <br />Public Works; and (iv) show recommended subdivision into separate contracts, if any. The parties understand <br />that the Engineer shall be responsible for coordinating all the Documents. The Engineer shall submit six (6) <br />copies of the preliminary design and outline specification documents to the Director of Public Works. The <br />Engineer shall attend preliminary conferences regarding the Project with officials from local, state and federal <br />agencies, utility companies and other entities and prepare meeting notes from such conferences. <br /> <br />(b) Phase II - Final Design. Based upon approved preliminary design documents and any further <br />adjustments in the scope or quality of the Project authorized by the Director of Public Works, the Engineer shall <br />perform the following Phase II services upon receipt of written notice to proceed signed by the Director. <br />
The URL can be used to link to this page
Your browser does not support the video tag.