Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />Mr. Chuck Harrington <br />City of La Porte <br />June 10,1993 <br />Page 5 <br /> <br />4. Soils, Geotechnical, Structural, Electrical or Mechanical Engineering <br />Services for analysis or design of project features, utilities, or municipal <br />services. <br /> <br />5. Preparation of Preliminary or Final Plats. <br /> <br />6. Work requested and/or authorized by the Client not defined in the Scope of <br />Services or revisions and charges in approved drawings and the preparation <br />of alternated requested by the Client and not in the Scope of Services. <br /> <br />7. Preparation of as-built drawings or of measured drawings or existing <br />conditions. <br /> <br />8. Meetings and/or formal presentations with City or County agencies or other <br />governmental bodies to get approval of the planning documents. <br /> <br />9. Additional work performed due to lack of performance, default, insolvency, <br />errors and/or omissions by other consultants retained by the Client and due <br />to no fault of Mitchell, Carlson & Associates, Inc. and its team. <br /> <br />10. Work performed due to delays as a result of Client decisions or other project <br />reasons and due to no fault of Mitchell, Carlson & Associates, Inc. and its <br />team. <br /> <br />11. Production of camera ready artwork for marketing or advertising purposes. <br /> <br />12. Models, special renderings, promotional photography, special <br />printing, special equipment, special printed reports or publications, maps, and <br />documents requested by the Client. <br /> <br />13. Landscape design of street landscapes, entries, sign age, bridges, and open <br />space or other areas within the project area. <br />