My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1847
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1992
>
O-1992-1847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:52 PM
Creation date
10/25/2006 7:29:42 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.... <br />'. , <br /> <br />~ <br />~ <br /> <br />- - <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />" <br /> <br />~. <br /> <br />June 15, 1992 <br /> <br /> <br />Mr. Robert Herrera <br />City Manager <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77572-1115 <br /> <br />Re: Engineering Services for the Farrington waterline Project <br /> <br />Dear Mr. Herrera: <br /> <br />Claunch & Miller, Inc, (CMI) is pleased to submit this proposal for <br />providing engineering services on the above referenced project. <br /> <br />DESCRIPTION OF PROJECT: <br /> <br />The project is for the replacement of a 12" waterline along the west side <br />of Farrington Blvd. from Spencer Highway to an elevated water storage <br />tank, a distance of approximately 3,000 linear feet. It also includes <br />replacement of the sidewalk on the west side of Farrington Blvd. <br /> <br />As per the City's directions, a new PVC 12" waterline will replace the <br />existing cast'iron 12" waterline. The alignment for the w?terline will be <br />between the western curb and" the western R.O.W, of Farrington Blvd. in the <br />same proximity as the existing waterline. <br /> <br />SCOPE <br /> <br />The scope of engineering services and the associated fees are as follows: <br /> <br />SURVEY SERVICES <br /> <br />o Provide survey services and base mapping of the project site <br />suitable for design. <br /> <br />o The survey will provide information on the west side of <br />Farrington from Spencer Highway to the Elevated Water Tank. <br />The survey will also provide information on existing utilities, <br />including manholes and water meters and valve information in <br />the median and on the east side of Farrington Blvd. <br /> <br />GEOTECHNICAL SERVICES <br /> <br />o Provide a geotechnical report presenting an investigation of <br />the soils in the project area. <br /> <br />o. The geotechnical report will provide usual and customary- <br />information on the existing soil. It will also include bedding <br />and backfill recommendations, and trench safety information. <br />The report will be based on information obtained from three (3) <br />ten (10) foot deep borings in the project area. <br /> <br />3701 Kirby Drive, Suite 892. Houston, Texas 77098. (713) 524-7113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.