My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1847
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1992
>
O-1992-1847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:52 PM
Creation date
10/25/2006 7:29:42 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />. <br /> <br />? <br /> <br />e <br /> <br />e <br /> <br />r/-:-:~~-~-'-? <br />, c/(---)::: \, <br />: , .""C;,,,,,/ <br />I !~:~__-=...,.f <br />.------- --.-" ....~ <br /> <br />PRELIMINARY ENGINEERING PHASE <br /> <br />o Research existing utilities in the project area, <br /> <br />o Determine a recommended alignment for the new waterline <br /> <br />o Determine construction method and/or scheduling to minimize <br />disruption of water service to the community. <br /> <br />o Prepare estimated construction costs for the project. <br /> <br />o Develop a project schedule. <br /> <br />o Prepare a report'presenting the findings, costs, schedules and <br />appropriate sketches or exhibits of recommended improvements. <br /> <br />o Provide five (5) copies of the preliminary engineering report <br />to the City of La Porte. <br /> <br />o <br /> <br />The <br />from <br />phase <br /> <br />preliminary <br />the City's <br /> <br />phase will be completed in 21 calendar days <br />written authorization to proceed with this <br /> <br />DESIGN ENGINEERING PHASE <br /> <br />o Prepare detailed plan and profile drawings of the final design <br />as presented in the preliminary engineering report. These <br />plans will be at a scale of 1" = 20' horizontal and 1" = 2' <br />vertical. Drawings will be prepared through C,A,D.D. (Computer <br />Aided Design and Drafting), The C.A.D.D. file will be supplied <br />to the City of La Porte. <br /> <br />o Prepare contract specifications suitable for bidding. <br /> <br />o Prepare an update of the construction cost based on the final <br />design. <br /> <br />o Furnish five (5) sets of construction documents to the City of <br />La Porte. <br /> <br />o The design phase will be completed in 22 calendar days from the <br />City's written authorization to proceed with the design phase. <br /> <br />CONSTRUCTION ADMINISTRATION PHASE <br /> <br />o Assist the City in obtaining bids for the Project. <br /> <br />o Dispense construction documents from eMI's office to potential <br />bidders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.