My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1847
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1992
>
O-1992-1847
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:52 PM
Creation date
10/25/2006 7:29:42 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />r:.-:::-::.:...::::- ':J:'~ --.~.~= <br />I; (---)::: \/ <br />(; , / <br />i \~ -':~ I \.J . <br />!~:-.~.=~.:..I._- .. :: <br />- ----- - -- --.. --,.j <br /> <br />CONSTRUCTION OBSERVATION (IF REQUESTED BY THE CITY) <br /> <br />o Provide a Project representative to observe and monitor the <br />progress and quality of the work by the Contractor. <br /> <br />o Provide daily reports on the status of the construction. <br /> <br />o <br /> <br />Take color photographs <br />construction. <br /> <br />of the Project's site prior to <br /> <br />o Participate in the processing of submittals and change orders <br />and the issuance of instructions as required by the City. <br /> <br />ADDITIONAL SERVICES <br /> <br />o "Additional Services" shall only be performed when directed by <br />the City to CMI. These services are not considered normal or <br />customary engineering services. <br /> <br />o Services resulting from significant changes in the extent of <br />th~ Project or its design including but not limited to changes <br />in size, complexity, the City's schedule, or character of <br />construction or method of financing; and revising previously <br />accepted studies, reports design documents or Contract <br />Documents when such revisions are due to causes beyond CMI's <br />control, <br /> <br />o <br /> <br />Preparing documents for <br />for Contractor(s) work <br />out of sequence work. <br /> <br />alternate bids requested by the City <br />which is not executed or documents for <br /> <br />o Preparing to serve or serving as a consultant or witness for <br />the City in any litigation, public hearing or other legal or <br />administrative proceeding involving the Project. <br /> <br />o Additional or extended services during construction made <br />necessary by (1) work damaged by fire or other cause during <br />construction, (2) a significant amount of defective or <br />neglected work of Contractor(s), (3) prolongation of the <br />construction contract time, (4) acceleration of the progress <br />schedule involving services beyond normal working hours and (5) <br />default of contractor <br /> <br />CMI will <br />additional <br />listed 5 <br />services. <br />services <br />CM!. <br /> <br />endeavor to apprise the City of any potential <br />or extended services which may result from the above <br />items, prior to CMI's expenditure of time on such <br />As previously noted, any such extended or additional <br />shall only be performed when directed by the City to <br /> <br />o Ad~itional services not otherwise provided for in the scope of <br />services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.