My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1984-1168-A (2)
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1980's
>
1984
>
O-1984-1168-A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:41 PM
Creation date
10/30/2006 1:42:48 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/18/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />- <br /> <br /> <br />City of La Porte Planning Department <br />INTER-OFFICE MEMORANDUM <br />November 19,2003 <br /> <br />TO: <br /> <br />Nick Finan, Interim Director of Planning <br /> <br />FROM: <br /> <br />Robert A. Cummings, Supervising Engineer <br /> <br />RE: <br /> <br />ACME Trucking <br /> <br />Attached are the cost estimates you requested. I ran the cost estimates f~ur basic ways: <br /> <br />1) The most direct route and city installed. This would require the purchase of <br />easements and allow for no reimbursement availability. <br />2) The most direct route installed by a contractor which would require the purchase <br />of easements and allow for no reimbursement availability. <br />3) Going down the existing 60 V.E. which would not require easements to be <br />purchased but would be a longer run, would allow for three other businesses to tie <br />onto the lines and allow for reimbursement. Cost estimate #3 is based on the City <br />installing the lines. <br />4) Going down the existing 60 V.E. which would not require easements to be <br />purchased but would be a longer run, would allow for three other businesses to tie <br />onto the lines and allow for reimbursement. Cost estimate #4 is based on a <br />private contractor installing everything. <br /> <br />All of these were scenarios were run under the assumption that gravity flow could be <br />achieved. They were subsequently run using a force main and lift station. When boring <br />under a railroad bed, the railroad requires that a dry bore be used. Dry boring is always <br />much more expensive than wet boring and will require the use of casing at least 6-inches <br />in diameter larger than the service pipe. Taking the utilities the long way would be the <br />best scenario even if it would be the most expensive as that would allow at least three <br />other businesses to tie on. Given that the City of La Porte has an ordinance against the <br />use of wells, it is recommended that at least the water line should be taken the long way. <br />Given the great importance on arresting subsidence in the greater Houston area, there is <br />no scenario in which I could recommend the allowance of a water well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.