Laserfiche WebLink
<br />ACME Trucking <br />Cost Estimate 1 <br />Most direct route - City Installed <br /> <br />Item <br />8-inch C-900 water line <br />6-inch SDR26 <br />6-inch dry bore <br />8-inch dry bore <br />Fire Hydrant <br />Easement (PPG) - 16 ft wide <br />Easement (RR) - 16 ft wide <br />Easement (HCFCD) - 16 ft wide <br />Surveyor Costs <br />Sanitary Sewer Manhole <br />Trench Safety <br /> <br />. <br /> <br />Quantity <br />383 <br />449 <br />110 <br />120 <br />1 <br />0.1425 <br />0.0852 <br />0,0705 <br />1 <br />2 <br />602 <br /> <br />Unit <br />LF <br />LF <br />LF <br />LF <br />EA <br />AC <br />AC <br />AC <br />LS <br />EA <br />LF <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br />Unit Price <br />5.00 <br />8.90 <br />114.00 <br />133.00 <br />1,500.00 <br />5,000.00 <br />5,000.00 <br />5,000.00 <br />2,000.00 <br />2,000.00 <br />0.25 <br /> <br />. <br /> <br />Total <br />$ 1,915,00 <br />$ 3,996.10 <br />$13,540.00 <br />$16,960.00 <br />$ 1,500.00 <br />$ 712.50 <br />$ 426.00 <br />$ 352.50 <br />$ 2,000.00 <br />$ 4,000.00 <br />$ 150.50 <br /> <br />$ 45,552.60 <br />$ 6,832.89 <br />$ 52,385.49 <br /> <br />Gravity Sanitary Sewer flow is assumed. If impossible, 4 inch force main would be needed and total cost <br />would be: . <br /> <br />subtotal <br />15% contingency <br />total <br /> <br />Item Quantity Unit Unit Price Total <br />8-inch C-900 water line 383 LF $ 5.00 $ 1,915.00 <br />4-inch SDR26 449 LF $ 4.63 $ 2,078.87 <br />4-inch dry bore 110 LF $ 95.00 $11,450.00 <br />8-inch dry bore 120 LF $ 133.00 $16,960.00 <br />Fire Hydrant 1 EA $ 1,500,00 $ 1,500.00 <br />Easement (PPG) -16 ft wide 0.1425 AC $ 5,000.00 $ 712.50 <br />Easement (RR) - 16 ft wide 0.0852 AC $ 5,000.00 $ 426.00 <br />Easement (HCFCD) -16 ft wide 0.0705 AC $ 5,000.00 $ 352.50 <br />Surveyor Costs 1 LS $ 2,000.00 $ 2,000.00 <br />Trench Safety 602 LF $ 0.25 $ 150.50 <br />Lift Station 1 LS $ 30,000.00 $ 30,000.00 <br /> subtotal $67,545.37 <br /> 15% contingency $10,131.81 <br /> total $ 77,677.18 <br />