Laserfiche WebLink
<br />:-:...; .:..::.:;.--:...:-... -:;::- r <br />1/ I~"'" -..\ ...... ; 'v' . <br />'J. ' \. ' . <br />~ ,,'\.. . "'......' I . <br />r,' (;; I : <br />~_:.~::.:.:";:~..=:'t ' <br /> <br />e <br /> <br />. <br /> <br />. . <br />___.a__~__...... _ ._ __ _ <br /> <br />SPECIAL SERVICES <br /> <br />Special services are those services that are beyond the basic services provided for in the scope <br />portion of this proposal. <br /> <br />Due to the nature of this project there are certain Special Services which are anticipated and <br />other special services which mayor may not be required. In the fee portion of this proposal the <br />special services which are anticipated are listed. Other special services may be required and may <br />be identified as the project progresses. A budgetary amount for these miscellaneous services is <br />noted in the fee section. Such services are to be performed only when authorized by the City. <br />Anticipated special services and potential special services include: <br /> <br />1. <br /> <br />Surveying <br /> <br />2. <br /> <br />Right-of-way research, deed research, and abstracting. <br /> <br />3. <br /> <br />Site Easement and Right of Way Acquisition work such as: preparation of metes <br />and bounds; verification of ownership of property; preparation and submittal of <br />title report or title commitment. <br /> <br />4. <br /> <br />Geotechnical Investigations <br /> <br />5. <br /> <br />Environmental Site Assessment <br /> <br />6. <br /> <br />Traffic Control Planning and Design <br /> <br />7. <br /> <br />Printing of Plans, Specifications, and Reports beyond those copies to be provided <br />as noted in basic services. <br /> <br />8. <br /> <br />Extra Construction Phase Services in the event the project extends beyond its <br />designated contract period. <br /> <br />9. <br /> <br />Additional or extended services during made necessary by (1) work damaged <br />during construction, (2) a significant amount of defective or neglected work of <br />Contractor(s), (3) prolongation of the construction contract time, (4) acceleration <br />of the progress schedule involving services beyond normal working hours and (5) <br />default of contractor <br /> <br />10. <br /> <br />Other miscellaneous tasks that the City of La Porte desires CM! to perform. <br /> <br />11. <br /> <br />Assist the City as an expert witness or factual witness in any legal proceedings or <br />litigation arising from the development, permitting or construction of the Project. <br /> <br />Page 60f9 <br />