Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />Ordinance No. 2003 - 2641 <br /> <br />Page 5 <br /> <br />Section 3: That Appendix A, Chapter 82, "Buildings and Building <br />Regulations," Article IV, "Electrical Code Permit Fee Schedule," of the Code of <br />Ordinances, La Porte, Texas, is hereby amended to read as follows: <br /> <br />ELECTRICAL PERMITS <br /> <br />Meter loop & service <br />{includes Temporary cut-in} <br /> <br />$ <br /> <br />15.00 <br /> <br />Reconnect of service <br /> <br />15.00 <br /> <br />Temporary saw pole (T-pole) <br /> <br />Outlets (lst 5) <br />{includes jinures, lights & switches} <br /> <br />15.00 <br /> <br />3.00 <br /> <br />Outlets (additional) <br /> <br />.60 each <br /> <br />Clothes Washer I Dryer <br /> <br />2.00 each <br /> <br />Range receptacle <br /> <br />3.00 each <br /> <br />Cook Top or Oven <br /> <br />1.50 each <br /> <br />Garbage disposal <br /> <br />1.50 each <br /> <br />Dishwasher <br /> <br />1.50 each <br /> <br />Water heater <br /> <br />3.75 each <br /> <br />AlC Window Unit receptacle <br /> <br />3.00 each <br /> <br />Motors: <br /> <br />Up to ~ h.p. <br />Yz h.p. & up to 10 h.p. <br />10 h.p. & up to 50 h.p. <br />50 h.p. & over <br /> <br />1.50 each <br />2.50 each <br />3.50 each <br />4.50 each <br /> <br />Re-Inspection fees <br /> <br />20.00 <br /> <br />Permit Issue Fee <br /> <br />7.50 <br /> <br />Minimum Permit Fee <br /> <br />20.00 <br /> <br />PENALTIES <br /> <br />When is wolk is started without the required permit, the fee herein specified shall be doubled. The <br />payment of such double fee shall not relieve any persons from fully complying with the requirements in the <br />execution oftbe work nor from any other applicable penaJties. <br />