My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2017-3669 Chapter 106 "Zoning" of the Code of Ordinances
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2017
>
O-2017-3669 Chapter 106 "Zoning" of the Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 8:14:22 AM
Creation date
2/28/2017 11:18:29 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Legislative No.
O-2017-3669
Date
2/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Motor Vehicle Parts and Dealers (441110-441228); <br /> g. Furniture and Related Product Manufacturing(337110-337122); <br /> h. Construction of Buildings(236115-236118); <br /> Contractors(238110-238390). <br /> 5. The commercial area shall be developed in accordance with the requirements for the General <br /> Commercial zone district. However,if the developer desires to subdivide the commercial area,then <br /> setbacks shall be as follows:external property line adjacent to Highway 146—25 feet;external <br /> property line adjacent to north and south public right-of-way—10 feet; internal property lines—0 <br /> feet. <br /> The residential land uses identified in the General Plan as"Townhouse"shall be constructed in <br /> accordance with the requirements outlined in Section 106-333 of the Code of Ordinances and <br /> applicable building code requirements and shall be limited to townhouse development only—not <br /> multifamily apartments or condominiums.The townhouse development may exceed the(12) <br /> twelve unit maximum for attached units and front setbacks for the townhouse development shall <br /> be permitted at a minimum of 5 feet from the front property line. <br /> 7. Additionally,the"Live-Work" units are permitted and shall comply with applicable setbacks that <br /> would be required for buildings in the Main Street Overlay District. If an attached garage is <br /> provided,then the rear setback for the building shall be 5 feet. <br /> 8. The perimeter boundaries of the property along the north and south property lines shall include <br /> the installation of an 8-foot high solid masonry fence intended to mitigate the impact of <br /> development on future residential development,as identified in the city's Future Land Use Plan. <br /> Additionally,shade trees shall be planted at 20'on center along the fence line. If land uses on the <br /> adjacent properties are modified in the future allowing for similar uses,then such fence and <br /> landscaping shall not be required.The northern fence shall be included and constructed as part of <br /> the first set of construction plans approved by the city,while the southern fence shall be <br /> constructed prior to the completion of the final phase of development. If at any time the property <br /> to the south of the proposed development is developed for single family residential,the southern <br /> boundary fence must be constructed at that time regardless of which phase of development the <br /> project is in. <br /> 9. In lieu of a fence along the eastern boundary of the project,the developer shall be required to <br /> plant shade trees,at a minimum 3"caliper and 20'on center. In addition to the shade trees, <br /> shrubs shall be planted at no less than 5 gallon in size with a minimum spacing of 3'on center. <br /> These plantings are required along the entire length of the eastern boundary and shall be in place <br /> prior to the completion of Phase II of the development. <br /> 10. The applicant shall install the segment of the city's Hike and Bike Trail through the development <br /> area as identified in the city's Comprehensive Plan.The construction of the trail shall be in <br /> accordance with all applicable requirements and specifications required by the City Engineer. <br /> Additionally,following construction of the Hike and Bike Trail,the developer shall dedicate to the <br /> City of La Porte a permanent public trail easement 20'on center for the Hike and Bike Trail. <br /> 11. The developer shall provide internal connection between the city's Hike and Bike Trail to the <br /> development. <br /> 12. The developer shall work with staff at the time of site plan review to minimize the amount of <br /> parking stalls along the Highway 146 frontage.This should be accommodated by relocating <br /> buildings in a manner that places parking on the side of the building or internal to the <br /> development. If this is not possible,the developer may install planter islands at 1 per 10 spaces for <br /> both rows of parking along a drive aisle parallel to Highway 146.Additionally, hedges shall be <br /> planted at 3-foot on center in two rows of plantings.Such hedge row shall be installed with a <br /> variety of plant material to provide visual diversity of plant materials. <br /> 13. For the commercial portion of the development, parking shall be calculated based on the aggregate <br /> amount of parking required and proposed;joint parking is allowed.Additionally the applicant may <br />
The URL can be used to link to this page
Your browser does not support the video tag.