Laserfiche WebLink
<br />CiVllT e~h <br />Engineering, Inc. <br /> <br />Civil Eng;neering <br />Water Resouroes <br />Transporlation <br />Structures <br />Economic Analysis <br /> <br />April 7, 2004 <br /> <br />Mr. John Joems <br />Assistant City Manager <br />City of La Porte <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />Re: Pond to Park Design-Revised Proposal <br /> <br />Dear Mr. Joems: <br /> <br />In accordance with my discussion with you on April 6, 2004, and at the meeting with Nick <br />Finan, Stephen Barr and Robert Cummings on February 18, 2004, CivilTech Engineering, Inc., <br />is pleased to present this revised proposal to provide professional engineering services for the <br />above referenced project. This proposal may serve as a Letter Agreement between the City of La <br />Porte, hereinafter referred to as the "Client", and CivilTech Engineering, Inc., hereinafter <br />referred to as the "Consultant". A General Terms of Agreement is attached hereto as Exhibit A <br />and made part of this Agreement. <br /> <br />This Letter Agreement presents the background, scope of work, compensation, and schedule to <br />perform the outlined services. <br /> <br />Background <br />The Client wishes to convert an existing residential detention facility into a public park/detention <br />facility that allows use by the general public and preserves the existing detention capability of <br />the pond. The detention facility is located near the intersection of Fairmont Parkway and <br />Driftwood Road. A feasibility study was completed by CivilTech Engineering last year and a <br />final conceptual plan was submitted to the City of La Porte on March 28, 2003. The City is <br />interested in a design that generally follows the conceptual plan and allows the improvements to <br />be constructed in phases with basic features constructed first and enhancements constructed at a <br />later date (see attached Preliminary Opinion of Probable Construction Cost). However, the city <br />requested that engineering fees for the basic park package and the engineering fees for the <br />enhancements be listed as separate line items, if possible. <br /> <br />It is our recommendation that all construction activities and/or features that involve excavation, <br />fill and grading of the detention basin surface that will impact the detention capacity and the <br />park's ability to function as a detention facility must be included in the basic park package. This <br /> <br />~20029/contractslPands to Park Design ProposaI.do<: <br /> <br />H-'on 11821 Tellle Road. CvDreSS. Texas 77429 . Tel: 281.304-0200 . Fax: 281.304-0210 <br />