Laserfiche WebLink
<br />Mr. John Joems <br />April 7, 2004 <br />Page 2 of6 <br /> <br />includes the excavation of the pond area, the fill associated with the viewing platform, the <br />vertical wall and footing required to support the viewing platform, the grading of the remaining <br />basin area and the installation of the I8-inch culverts and 48-inch outfall structure. After final <br />grading, the surface must be stabilized by revegetation, either by sodding or hydro mulching. We <br />would also recommend that the 4-inch water line be installed at this time to avoid future <br />excavation of the revegetated surface. The pipe can be installed as part of the basic package, but <br />the wet connection to the exiting waterline can be done as part of a later construction phase. <br />Although the elevated viewing platform and associated retaining wall should be included in the <br />basic park package, the pave stones for the viewing platform surface can be easily added in a <br />later phase. During the interim, it is recommended that the surface be revegetated by sodding or <br />hydromulching. Please refer to the attached Exhibit C for a detailed listing of basic park design <br />features and enhanced park features to be included at a later date. <br /> <br />In addition, the City desires to investigate the cause of frequent flooding at several intersections <br />along Driftwood Drive along the western boundary of the project and to design improvements to <br />facilitate drainage into the proposed pond in order to alleviate the drainage problems. It is our <br />understanding that the City of La Porte will provide the landscaping plants and materials for the <br />landscaping needs of the park. In addition, it is our understanding that the City will identify a <br />landscape architect/water feature designer to aid in the design ofthe pond. <br /> <br />Scope of Work <br />Services to be provided by this firm would consist of the following: <br /> <br />1. Site Visits, Coordination and Meetings: Visit site and attend meetings with client, <br />governing agencies including the City of La Porte, Harris County Flood Control District, <br />Harris County and utility companies as needed for coordination during the design phase <br />and plan preparation. <br /> <br />2. Topographic Survey: It is our understanding that the City of La Porte will provide a <br />topographic survey of all existing surface features and top of ground elevations at 100 <br />foot intervals of the detention basin site. In addition, they will provide top of curb and top <br />of pavement elevations for the section of Driftwood fronting the existing detention basin <br />and the section of Springwood Drive fronting the reserve to facilitate the drainage <br />analysis of Driftwood. <br /> <br />3. Geotechnical Investigation - Provide a geotechnical investigation of the site to determine <br />suitability of existing soil conditions for construction of the amenity pond. Provide <br />recommendations for an appropriate liner should existing soil conditions prove <br />inadequate to properly retain water for the pond. <br /> <br />4. Site Design: Provide plan view drawing(s) of the geometric layout for construction of the <br />park with site features located as required (inc1. 4-inch waterline). Provide full dimension <br />controls for the pond, viewing platform, retaining wall, trails, picnic area, parking lot <br />(inc1. striping), and other misc. improvements. Obtain all required approvals from the <br />City of La Porte, Harris County and Harris County Flood Control District, as required. <br />