<br />CANADA ROAD BID TABULATION
<br />11/15/2004
<br />
<br /> ENG. ESTIMATE ANGEL BROTHERS BEYER CONST. CONRAD CONST. HUFF&MITCHEl REYTEC CONST. TRIPLE B SERVo TEXAS STERLING
<br />A. PAVING $ 1,639,020.00 $ 1,623,830.00 $ 1,776,775.00 $ 1,635,342.00 $ 1,629,115.00 $ 1,688,860.00 $ 1,991,295.00
<br />B. DRAINAGE $ 664,947.50 $ 541,240.50 $ 763,215.00 $ 658,998.00 $ 669,144.50 $ 621,853.00 $ 847,734.00
<br />C. WATERLINE $ 147,120.00 $ 95,237.00 $ 137,927.00 $ 127,210.00 $ 145,025.00 $ 93,501.00 $ 147,340.00
<br />D. SEWER $ 523,450.00 $ 435,006.50 $ 558,391.00 $ 524,958.00 NO-BID $ 706,003.25 $ 470,953.00 $ 530,066.00
<br />E. EXTRA WORK $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00
<br />TOTAL BASE $ 3,024,537.50 $ 2,745,314.00 $ 3,286,308.00 $ 2,996 508.00 $ 3,199,287.75 $ 2,925,167.00 $ 3,566,435.00
<br />AL TERNA TE 1 $ 35,100.00 $ 25,460.00 $ 22,800.00 $ 22,800.00 $ 22,800.00 $ 26,600.00 $ 42,560.00
<br />AL TERNA TE 2 $ 19,350.00 $ 22,840.00 $ 22,200.00 $ 20,400.00 $ 18,600.00 $ 23,275.00 $ 35,890.00
<br />
<br />LOW BID
<br />STREET/DRAINAGE I $ 2,408,417.50 I $ 2,263,370.50 I
<br />
<br />ITOTAL UTILITY
<br />
<br />I $ 670,570.00 I $
<br />$ 3,078,987.50 $
<br />
<br />530,243.50 I
<br />2,793,614.00
<br />
<br />TOTAL
<br />
|