Laserfiche WebLink
<br />COST ESTIMATE FOR CONSTRUCTION OF CANADA ROAD <br /> <br />Exhibit A <br /> <br />Subtotal <br />5% Contingencies <br />Total Construction <br /> <br />Cost <br />$ 1,623,830.00 <br />$ 541,240.50 <br />$ 50,000.00 <br />$ 25,460.00 <br />$ 22,840.00 <br />$ 2,263,370.50 <br />$ 113,168.53 <br />$ 2,376,539.03 <br /> <br />Joint Venture 50% Eligible Items <br />Harris County City of La Porte <br />$ 811,915.00 $ 811,915.00 <br />$ 270,620.25 $ 270,620.25 <br />$ 25,000.00 $ 25,000.00 <br />$ $ 25,460.00 <br />$ $ 22,840.00 <br />$ 1,107,535.25 $ 1,155,835.25 <br />$ 55,376.76 $ 57,791.76 <br />$ 1,162,912.01 $ 1,213,627.01 <br /> <br />RoadwaylDrainage <br /> <br />Pavin <br />Draina e <br />Extra Work <br />Alternate 1 Sidewalk <br />Alternate 2 Sidewalk <br /> <br /> <br />Waterline Installation <br />Sewerline and Lift Station Installation <br />Subtotal <br />5% Contingencies <br />Total Utilities <br />Engineering, Survey & Geotech <br />Freese & Nichols Phase I Desi n $ 192,295.00 $ 96,147.50 $ 96,147.50 <br />Freese & Nichols Phase II Desi n $ 46,375.00 $ 23,187.50 $ 23,187.50 <br />Freese & Nichols Utilit Desi n $ 43,395.00 $ $ 43,395.00 <br />Freese & Nichols Construction Phase I $ 26,305.00 $ 13,152.50 $ 13,152.50 <br />Freese & Nichols Construction Phase II $ 2,275.00 $ 1,137.50 $ 1,137.50 <br />Freese & Nichols Utility Construction Phase $ 11,575.00 $ $ 11,575.00 <br />Pro'ect Representative - Street/Draina e3 $ 77,042.00 $ 38,521.00 $ 38,521.00 <br />Pro'ect Representative - Uti lit Installation $ 13,213.00 $ $ 13,213.00 <br />Materials Testing - Street/Drainage 4 $ 42,680.00 $ 21,340.00 $ 21,340.00 <br />Materials Testing - Utility Installation $ 7,320.00 $ $ 7,320.00 <br />Total Engineering $ 462,475.00 $ 193,486.00 $ 268,989.00 <br /> <br /> <br /> <br />, Represents 65.58% of Estimated Cost <br />2 Represents 50% of Estimated Cost <br />3 Represents 85.36% of Estimated Inspection Cost ($100,000) <br />4 Represents 85.36% of Estimated Testing Costs <br />