Laserfiche WebLink
<br />Tower Materials <br /> <br />$14,887.00 <br /> <br />Complete Tower Steel and Hardware <br /> <br />Anchor Bolts and Templates <br /> <br />Climbing Step Bolts (one leg only) <br /> <br /> <br />One (1) waveguide Support Ladder ( up to six lines) <br /> <br />DBl Safety Cable Kit with Harness and Leg Bracket <br /> <br /> <br />EIA standard Grounding with one (1) 4' x 5/8" Copper-Clad Steel Lightning Rod <br /> <br />4 each 3' sidearm <br /> <br />Tieback Kit <br /> <br />Waveguide Bridge 2-Leg 20'x 12" with (3) I' Single Run Trapeze Kits <br /> <br />P.E. Certified Tower Profile and Foundation Drawing <br /> <br />Final Erection Drawings <br /> <br />Foundation Installation $18,500.00 <br />Tower Erection $14,965.00 <br />Tower Freight $3,200.00 <br />Anchor Bolt Freight $439.00 <br />Underground Grounding loop $16,018.00 <br />Empty Conduit for Distribution *$2700.00 <br />Layout $550.00 <br />Disposal of Spoil $631.00 <br />Testing $485.00 <br />