<br />GENERAL CONDITIONS OF AGREEMENT
<br />BETWEEN CITY OF LA PORTE (City) AND HUITT-ZOLLARS, INC. (Huitt-Zollars)
<br />
<br />1. STANDARD TERMS FOR ARCHITECTURAL, ENGINEERING, PLANNING AND
<br />TECHNICAL SERVICES:
<br />
<br />A. "Salary Cost' is defined as the cost of actual salaries of architects, engineers,
<br />planners, draftsmen, clerks, stenographers, surveyors, etc., for time directly
<br />chargeable to the project.
<br />
<br />B. "Subcontract Expense" is that incurred by the Huitt-Zollars in employment of
<br />outside firms for services (if not obtained directly by City), such as soil borings
<br />and tests, surveying, aerial photography, construction of physical models, and
<br />similar services. "Direct Non-labor Expense" is that incurred by the Huitt-Zollars
<br />for supplies, transportation, tolls, parking fees, equipment, travel,
<br />communications, xerox copies, faxes, printing of drawings and specifications,
<br />postage, subsistence and lodging away from home, and similar incidentals in
<br />connection with the Project. Those subcontract expenses and direct non-labor
<br />expenses authorized by the City and defined as "Additional Services," shall be
<br />reimbursed to the Huitt-Zollars as speCified in Attachment C - Schedule of Fees.
<br />
<br />C. "Construction Cost" (applied where fees for basic services are expressed as a
<br />percentage of "Construction Costs") is the total cost of Project facilities
<br />authorized and handled in each separate phase of basic services; excluding
<br />costs for Huitt-Zollars services, legal services, the costs of lands and rights-of-
<br />way; but including the total cost for completed construction (including
<br />modifications, and/or additions). The construction cost amount may vary from
<br />one phase to the next, depending upon work authorized by the City.
<br />Construction cost definition also includes cost of work authorized for design but
<br />not constructed. For work not constructed, such as suspended work or
<br />alternates not elected, the lowest bona fide bid received from a qualified bidder
<br />will be the construction cost, or if no bids have been received, then the Huitt-
<br />Zollars's estimate shall be used as a measure of construction cost. labor
<br />furnished by the City for the project shall be included in the construction cost at
<br />current market prices. Materials and equipment furnished by the City shall be
<br />included at current market prices, except that used materials and equipment shall
<br />be included as if purchased new for the Project. Where percentage fees are
<br />obtained from a table or graph, a separate percentage fee shall be determined
<br />and used for each separate construction contract for which separate designs and
<br />construction documents are prepared.
<br />
<br />2. COORDINATION WITH THE CITY:
<br />
<br />The Huitt-Zollars shall hold periodic conferences with the City, or his representatives, to
<br />the end that the Project, as it progresses, shall have benefit of the City's experience and
<br />knowledge of existing needs and facilities, and be consistent with his current policies
<br />and construction standards. To implement this coordination, the City shall make
<br />available to the Huitt-Zollars, for use in planning the Project, all existing plans, maps,
<br />field notes, statistics, computations and other data in his possession relative to existing
<br />facilities and to the Project. The City shall furnish all legal, accounting and insurance