<br />ATTACHMENT B <br /> <br />GENERAL CONDITIONS OF AGREEMENT <br />BETWEEN CITY OF LA PORTE (City) AND HUITT-ZOLLARS, INC. (Huitt-Zollars) <br /> <br />1. STANDARD TERMS FOR ARCHITECTURAL, ENGINEERING, PLANNING AND <br />TECHNICAL SERVICES: <br /> <br />A. "Salary Cost' is defined as the cost of actual salaries of architects, engineers, <br />planners, draftsmen, clerks, stenographers, surveyors, etc., for time directly <br />chargeable to the project. <br /> <br />B. "Subcontract Expense" is that incurred by the Huitt-Zollars in employment of <br />outside firms for services (if not obtained directly by City), such as soil borings <br />and tests, surveying, aerial photography, construction of physical models, and <br />similar services. "Direct Non-labor Expense" is that incurred by the Huitt-Zollars <br />for supplies, transportation, tolls, parking fees, equipment, travel, <br />communications, xerox copies, faxes, printing of drawings and specifications, <br />postage, subsistence and lodging away from home, and similar incidentals in <br />connection with the Project. Those subcontract expenses and direct non-labor <br />expenses authorized by the City and defined as "Additional Services," shall be <br />reimbursed to the Huitt-Zollars as speCified in Attachment C - Schedule of Fees. <br /> <br />C. "Construction Cost" (applied where fees for basic services are expressed as a <br />percentage of "Construction Costs") is the total cost of Project facilities <br />authorized and handled in each separate phase of basic services; excluding <br />costs for Huitt-Zollars services, legal services, the costs of lands and rights-of- <br />way; but including the total cost for completed construction (including <br />modifications, and/or additions). The construction cost amount may vary from <br />one phase to the next, depending upon work authorized by the City. <br />Construction cost definition also includes cost of work authorized for design but <br />not constructed. For work not constructed, such as suspended work or <br />alternates not elected, the lowest bona fide bid received from a qualified bidder <br />will be the construction cost, or if no bids have been received, then the Huitt- <br />Zollars's estimate shall be used as a measure of construction cost. labor <br />furnished by the City for the project shall be included in the construction cost at <br />current market prices. Materials and equipment furnished by the City shall be <br />included at current market prices, except that used materials and equipment shall <br />be included as if purchased new for the Project. Where percentage fees are <br />obtained from a table or graph, a separate percentage fee shall be determined <br />and used for each separate construction contract for which separate designs and <br />construction documents are prepared. <br /> <br />2. COORDINATION WITH THE CITY: <br /> <br />The Huitt-Zollars shall hold periodic conferences with the City, or his representatives, to <br />the end that the Project, as it progresses, shall have benefit of the City's experience and <br />knowledge of existing needs and facilities, and be consistent with his current policies <br />and construction standards. To implement this coordination, the City shall make <br />available to the Huitt-Zollars, for use in planning the Project, all existing plans, maps, <br />field notes, statistics, computations and other data in his possession relative to existing <br />facilities and to the Project. The City shall furnish all legal, accounting and insurance <br /> <br />B-1 <br />