My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2005-2822
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2005
>
O-2005-2822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:17 PM
Creation date
2/18/2008 2:20:51 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IV. CONSTRUCTION ADMINISTRATION PHASE <br /> <br />A. The Huitt-Zollars shall, as requested and on an hourly basis, provide services to the <br />City's PM during the construction phase of the project. This effort may include, but is <br />not limited to, the following. <br /> <br />1. Conduct periodic site visits to observe the construction of the project. <br />Observations are to determine that the workmanship, quality of materials, and <br />system(s) performance are in general conformance with the requirements of the <br />plans and specifications. Observation shall be provided by personnel technically <br />qualified by education and experience to competently observe such work. <br /> <br />2. Provide a written report on all site visits and submit to the City within 7 calendar <br />days of site visit. Copies shall be submitted in hard copy and electronic format. <br />Electronic format may be submitted as attachments to e-mail. <br /> <br />3. Review technical submittals, shop drawings, catalog data, laboratory, shop and <br />mill test reports of materials and equipment for general conformance with design <br />concepts. <br /> <br />4. Provide independent cost estimates and evaluation of any proposed changes to <br />the project either provided by the D-B as a "value engineering" proposal or as <br />requested by City as a project enhancement/modification. This is to include <br />assisting City, as requested, with negotiations for any proposed change <br />determined by City to add value to the project. <br /> <br />5. Upon receipt of notification by the D-B that the work or a portion thereof as <br />specified in the contract documents has been completed, the Huitt-Zollars and <br />City shall conduct an inspection, performed by the appropriate members of his <br />staff and/or affiliates and shall prepare a list of the items needing correction. <br />After the D-B has performed the required corrections satisfactory to the City, a <br />final inspection will be conducted. The Huitt-Zollars shall accompany City on the <br />final inspection to assure that the work or portion thereof has been completed in <br />accordance with the requirements of the Contract Documents. The Huitt-Zollars <br />shall review all warranties, guarantees, bonds, equipment operating manuals, <br />etc. to ensure that all documents are received and that they meet the <br />requirements of the Contract Documents, after which they shall be transmitted to <br />City. The Huitt-Zollars shall direct and attend the operational training sessions <br />designed to teach and assist the City's Maintenance personnel in the safe and <br />thorough repair and maintenance of the buildings, equipment and systems. <br /> <br />6. The Huitt-Zollars shall recommend to the City, once all contract requirements <br />have been satisfied by the D-B, beneficial occupancy. <br /> <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.