My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2005-2822
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2005
>
O-2005-2822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:17 PM
Creation date
2/18/2008 2:20:51 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT A <br /> <br />SCOPE OF SERVICES <br /> <br />I. REQUEST FOR PROPOSAL PREPARATION PHASE <br /> <br />A. Huitt-Zollars, Inc. (Huitt-Zollars) shall review, discuss and assist the City of La Porte <br />(City) in the refinement of the existing Architectural Program Report (APR) to be <br />used as the basis for the Request For Proposal (RFP) that will be issued to the <br />Design-Builders (D-Bs). This effort may include, but is not limited to, the following. <br /> <br />1. Meet with the City's PM and others, as designated by City's PM, for formulation <br />and refinement of the APR. The Huitt-Zollars should allow for one meeting for <br />this effort. <br /> <br />B. The Huitt-Zollars shall prepare the design guideline and technical specifications for <br />the RFP. This effort shall include the following. <br /> <br />1. Provide recommendations to City's PM for geotechnical investigation services to <br />be provided by Others under separate contract with the City. This effort shall <br />include a limited number of borings to provide D-Bs with a "snap shot" of geology <br />that may be encountered on the site. <br /> <br />2. Provide recommendations to the City's PM for survey services to be provided by <br />Others under separate contract with the City. <br /> <br />3. Prepare drawings necessary to properly convey the requirements of the project. <br />Drawings shall include only a schematic site layout with utility connections <br />identified and floor plan. <br /> <br />4. Prepare Section 01010 - Design Guideline (DG) and Division 1 -16 Technical <br />Performance Specifications (TPS) for the architectural and engineering elements <br />of the project. The DG will be a comprehensive document that identifies the <br />overall scope of the project. <br /> <br />II. DESIGN-BUILDER PROPOSAL EVALUATION PHASE <br /> <br />A. The Huitt-Zollars shall, as requested and on an hourly basis, assist with the review <br />and evaluation of the D-Bs proposals. Final selection of the "best value" D-B will lie <br />solely with the City. This will be accomplished via a selection committee composed <br />of City employees. The PM's effort includes the following. <br /> <br />1. Evaluate technical and managerial elements of each D-B proposal and rank in <br />accordance with criteria established in the RFP and in a format approved by <br />City's PM. <br /> <br />2. Evaluate the Schematic Design element of each D-B proposal and rank in <br />accordance with criteria established in the RFP and in a format approved by <br />City's PM. <br /> <br />A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.