Laserfiche WebLink
<br />Fixed Equipment List <br />Refrigeration Equipment <br />Equipment <br />Condensing Unit <br />Evaporators <br /> <br />Compressors <br />Starters for Compressors <br />Condensers <br />Refrigerant Vessels <br />Heat Exchanger <br />Motor Control Center <br /> <br />Qty. <br />1 <br />20- freezer area <br />4-dock area <br />I-USDA inspection room <br />4 <br />4 <br />2 <br />4 <br />1 <br />1 <br /> <br />FKI Logistex Condor Cranes <br />The Condor Cranes (8 for this facility) are fixed in place full mast material <br />handling hybrid cranes. They are fixed in place within the freezer area. <br /> <br />C. Project timeline-construction start date and end date. <br /> <br />Preferred Freezer Services intends to start this project upon receipt of the tax <br />abatement. Preferred Freezer Services is hopeful to have a start date of November <br />1,2006 with a scheduled completion date of May 1, 2007. <br /> <br />D. Environmental impact information must be provided, noting any anticipated <br />impacts of the project on the environment, including; but not limited to, water <br />quality, storm water and runoff, floodplain and wetlands, solid waste disposal, <br />noise levels and air quality. Further, include history of environmental compliance <br />by company as required in Guidelines and Criteria. <br /> <br />Preferred Freezer Services is committed to maintaining an excellent <br />environmental record and complying with all local, state and federal mandates. A <br />Phase I environmental site assessment, which is attached, was performed on the <br />207 acres of property of which is the 9.2 acres Preferred Freezer Services plans on <br />acquiring. There were no issues or findings noted. The proposed facility will not <br />have an adverse affect on this site. Preferred Freezer Services believes in the <br />environment and its surroundings, including neighbors.. All equipment is indoors <br />and therefore minimal noise levels go outside the facility. Even the back up <br />generator is in an enclosure to eliminate engine noise. There will be an enclosed <br />trash compactor on site to prevent rodents, odor and other issues relating to waste <br />disposal. <br /> <br />E. All other governmental assistance/incentives being requested or already approved <br />for the project, (e.g. Industrial Development Bonds, Smart Job Funds). <br /> <br />There are none at the time of application. <br />