Laserfiche WebLink
<br />ADDENDUM TO OPERATIONS AND MAINTENANCE <br />FOR THE SOUTHEAST WATER PURIFICATION PLANT <br /> <br />A. Operation and Maintenance Services bv Manas!ine Participant. <br /> <br />During the Service Term, the Managing Participant shall provide full time management, <br /> <br />operation and maintenance for the Plant by means of the Managing Participant's employees. <br /> <br />The Managing Participant shall operate and maintain the Plant in accordance with Attachment <br /> <br />A-O&M Scope of Services and all applicable federal and state laws, regulations and permits. <br /> <br />B. Costs. <br /> <br />Cost of Services shall be calculated as provided in 3.4 and Exhibits "E", "E Pasadena" <br /> <br />and "E La Porte Area Water Authority", except: <br /> <br />1. Treated water will be produced at an electrical efficiency of no more than 1100 <br /> <br />kilowatt hours per million gallons treated, determined on an annual basis. <br /> <br />Participants will not be required to make payment for electrical costs, on a per <br /> <br />million gallon basis, in excess of this maximum usage. Should the annual average <br /> <br />usage exceed the specified efficiency, reimbursement will be made by the <br /> <br />Managing Participant in the annual operations and maintenance cost true up. <br /> <br />2. Treated water will be produced at an efficiency determined by the maximum <br /> <br />treatment chemical usages per million gallons treated specified below (list), as <br /> <br />determined on an annual average basis: <br /> <br />Ferric Sulfate - 300.0 IbslMG <br /> <br />Lime - 150 IbslMG <br /> <br />Caustic - 15 IbslMG <br /> <br />Polymer - 30 IbslMG <br /> <br />S:lpweshareIPLANSEC1\Waler Supply and COSI Sharing ComractslTreated Water Supply ComractslSoulheasl Plamlsoulheast expansion <br />contraclloperatlOns addendumIADMSEWP091206accepled.DOC 1 September 12.2006 <br />