My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2006-2951
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2006
>
O-2006-2951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:35:43 PM
Creation date
5/10/2008 5:43:43 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/23/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
quantified where practical. A report of these studies and the ENGINEER's recommendations <br />thereon shall be prepared. The ENGINEER will furnish sufficient copies of the report, present, <br />and review it in person with the OWNER. <br />1.3 Design Phase- after written authorization to proceed with the design phase, ENGINEER <br />shall: <br />1.3.1 On the basis of the accepted preliminary documents prepare for incorporation in the <br />contract documents, final drawings to show the character and scope of the work to be performed <br />by contractors on the Project and specifications. <br />1.3.2 Establish the scope of any soil and foundation investigations or any special surveys and <br />tests which, in the opinion of the ENGINEER, may be required for design; arrange for such work <br />to be done for the OWNER'S account. <br />1.3.3 Furnish to the OWNER, where required by the circumstances of the assignment, the <br />engineering data necessary for applications for routine permits by local, state, and federal <br />authorities (as distinguished from detailed applications and supporting documents for <br />government grants-in-aid, or for planning advances). <br />1.3.4 Prepare detailed specifications and contract drawings, in pencil or ink on paper or plastic <br />film, for construction authorized by the OWNER. <br />1.3.5 Prepare detailed cost estimates of authorized construction. The ENGINEER shall not be <br />required to guarantee the accuracy of these estimates. <br />1.3.6 Furnish to the OWNER all necessary copies of approved plans, specifications, notices to <br />bidders, and proposal forms. All sets of plans in excess of agreed number are to be paid for <br />separately. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.