Laserfiche WebLink
<br /> <br />1. Extra Construction Phase Services in the event the project extends beyond its <br />designated contract period. (If required) <br /> <br />J. Other miscellaneous tasks that the City of La Porte desires CMI to perform. <br /> <br />K. Assist the City as an expert witness or factual witness in any legal proceedings or <br />litigation arising from the development, permitting or construction of the Project. <br /> <br />L. Assist the City in making arrangements for the work to proceed in the event that the <br />construction contractor is declared in default for any reason. <br /> <br />M. Prepare supporting data and other services in connection with change orders in the <br />event the scope of services is changed or modified. <br /> <br />N. Services and costs associated with any special efforts or studies involving this <br />project such as State Revolving Fund applications, reports, trips to Austin, or <br />associated work. <br /> <br />O. Assist the City in securing any special licenses or permits (USACOE, etc.) which <br />may be required for the completion of the project, it being understood by the parties <br />of this agreement that the fees for said special licenses and permits will be paid by <br />the City. <br /> <br />P. Provide any other services related to the project not otherwise indicated in the Scope <br />of Services and not customarily furnished in accordance with generally accepted <br />engineering practices. <br /> <br />Q. Re-packaging of bid documents to provide multi-bid packages and/or rebidding the <br />project. <br /> <br />R. The provision of the construction site representation and associated supervision and <br />administration and associated costs. <br /> <br />S. Preparing the bid document so that it can be bid in two packages with two contracts. <br /> <br />T. Conducting and attending a pre bid conference. <br /> <br />Page 6 of7 <br />