Laserfiche WebLink
<br /> <br />IV. FEE <br /> <br />The fee is separated into: Design Phase, and Construction Phase. Any Additional Services <br />requested by the City will be invoiced and paid for at the direct cost plus 10% and CMI labor <br />costs at raw labor cost times a factor of 3.05. Such tasks and costs will only be performed upon <br />authorization from the City. <br /> <br />DESIGN ENGINEERING PHASE <br /> <br />Design Phase Services: <br />Electrical Subconsultant: <br /> <br />The lump sum cost of: <br />The cost plus 10% cost of: <br /> <br />$ 38,300.00 <br />$ 8,800.00 <br /> <br />Total of Design Engineering phase: $ 47,100.00 <br />CONSTRUCTION PHASE SERVICES <br /> <br />Bid Phase Services: <br />Construction Administration services: <br />Electrical Subconsultant cost: <br /> <br />The lump sum cost of: <br />The lump sum cost of: <br />The cost plus 10% cost of: <br /> <br />$ 3,430.00 <br />$11,100.00 <br />$ 2,380.00 <br /> <br />Total of Construction Phase: <br /> <br />$ 16,910.00 <br /> <br />Total Fees associated with the above described scope of work is: <br /> <br />$ 64,010.00 <br /> <br />Claunch & Miller, Inc. appreciates the opportunity to submit this proposal and we look forward <br />to working with the City of La Porte on this very important project. Our project manager for this <br />project will be James E. Thompson, P.E. and he can be reached at the number below if you have <br />questions or need further information. <br /> <br />Sincerely, <br /> <br />CLAUNCH & MILLER, INC. <br /> <br />lA~cGt,- J ~ <br /> <br />Christopher E. Claunch, P.E. <br />President <br /> <br />Page 7 of7 <br />