Laserfiche WebLink
Parsons House <br />SCU08-007 <br />Page 3 of 5 <br />Topography — This area is relatively flat and stable and should not be an <br />obstacle to this type of development. <br />Density — Based on the current 60 units of the facility and 5.637 acres <br />available, the overall density equals 10.64 units per acre. This is close to the <br />10 unit per acre limit established for quadraplex, townhomes, one of the <br />highest densities permitted for R-2 uses. The additional 41 units constructed <br />on the undeveloped portion of the tract would significantly impact overall <br />density. The net density would be 17.91 units per acre exceeding the current <br />10 dwelling units per acre for R-2 uses and 14 DU/A permitted for multi- <br />family development in R-3 zoning districts. <br />Staff s research shows that the neighboring cities use criteria of 18-20 <br />dwelling units per acre for any type of housing for senior citizen that is rent <br />controlled or rental housing units. In this case, the owner/builder may request <br />a density allowance to be approved by the Commission and City Council. <br />Utilities and Drainage — The proposed project shall be served by the City <br />water and sewer system and fire hydrants shall be installed at such locations <br />as necessary to provide fire protection. Potable water is readily available. <br />Water line extension shall be required for the purpose of providing internal <br />fire protection to the proposed addition. This extension must run north from <br />the existing valve and will have one or more fire hydrants installed on the <br />line in compliance with the current fire codes. The water line and fire <br />hydrants must be located within a 10' wide dedicated utility easement along <br />the eastern property line. <br />Sanitary sewer is also available to the property from the adjacent Brookglen <br />Subdivision. The capacity of an existing service has been field verified by <br />the Public Works Department. As proposed, sewer demand from the facility <br />may impact the ability to provide service to future residential development in <br />the area specifically to the east of the subject tract. <br />The facility has on-site detention located just north of the current assisted <br />living center. The addition is proposed at the site of the present detention <br />system, the detention basin is planned to move further north of the facility. <br />This project would add a significant amount of storm runoff due to an <br />increase in impervious cover (pavement). Particular attention must be given <br />to the impacts of storm water runoff effects to the residential subdivision to <br />the north. <br />Storm water management techniques and proper maintenance of the <br />detention system is suggested. In addition, Harris County Flood Control <br />District (HCFCD) approval shall be required for overall detention of the <br />facility. <br />