<br />!"~ <br />h <br />t .: <br /> <br />38. Samples--Physical examples of materials, <br />equipment, or workmanship that are representative of <br />some portion of the Work and which establish the <br />standards by which such portion of the Work will be <br />judged. <br /> <br />39. Shop Dmwings-All drawings, diagrams, illustra- <br />tions, schedules, and other data or information which are <br />specifically prepared or assembled by or for CON- <br />TRACTOR and submitted by CONTRACTOR to <br />illustrate some portion of the 'York. <br /> <br />40. Site--Lands or areas iDdicated in the Contract <br />Documents as being furnished by OWNER upon which <br />the Work is to be perfonned, including rights-of-way and <br />easements for access thereto, and such other lands <br />tumished by OWNER which are designated for the use of <br />CONTRACTOR. ' <br /> <br />r - <br /> <br />41. Specifications-That part of the Contract <br />Documents consisting of written technical descriptions of <br />materials, equipment, systems, standards, and <br />workmanship as applied to the Work and certain <br />administrative details applicable thereto. <br /> <br />42. Subcontractor-An individual or entity having a <br />direct contract with CONTRACTOR or with any other <br />Subcontractor for the performance-of a part of the Work <br />at the Site. <br /> <br />, " <br />\ <br />\ :' <br />L.: <br /> <br />43. Substantial Completion-- The time at which the <br />Work (or a specified part thereof) has progressed to the <br />point where, in the opinion of ENGINEER, the Work (or <br />a 'specified part thereof) is sufficiently complete, in <br />accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the <br />purposes for which it is intended. The terms <br />"substantially complete" and "substantially completed" as <br />applied to all or part of the Work refer to Substantial <br />completion thereof. <br /> <br />1.: <br /> <br />i, <br /> <br />44. Supplementary Conditions-- That part of the <br />Contract Documents which amends or supplements these <br />General Conditions. <br /> <br />45. Supplier--A manufacturer, fabricator, supplier, <br />distributor, materialman, or vendor having a direct <br />contract with CONTRACTOR or with, any Subcontractor <br />to furnish materials or equipment to be inCOJPOrated in <br />the Work by CONTRACTOR or any Subcontractor. <br /> <br />46. Underground Facilities-All undergroWld <br />pipelines, conduits, ducts, cables, wires, manholes, <br />vaults, tanks, tunnels, or other such facUities or <br />attachments, and any encasements containing such <br />facilities, including those that convey electricity, gases, <br /> <br />..., <br /> <br />steam, liquid petroleum products, telephone or other <br />communications, cable television, water, wastewater, - ~ <br />storm water, other liquids or chemicals, or traffic or ~ <br />other control systems. <br /> <br />47. Unit Price Woric--Work to be paid for on the <br />basis of unit prices. <br /> <br />48. Work-The entire completed construction or the <br />various separately identifiable parts thereof required to be <br />provided under the Contract Documents. Work includes' <br />and is the result of performing or providing all labor, - <br />services, and dOCUIIieirtation necessary to produce such <br />construction, and furnishing, installing, and incorporating <br />all materials and equipment into such construction, all as - <br />required by the Contract Documents. <br /> <br />, , <br />49. Work Change Directive-A written statement to _ <br />CONTRACTOR issued on or after the Effective Date of <br />the Agreement and signed by OWNER and recommended <br />by ENGINEER ordering an addition, deletion, or revision <br />in the Work, or responding to differing or unforeseen - <br />subsurface or physical conditions under which the Work <br />is to be perfonned or to emergencies. A Work Change <br />Directive will not change the Contract Price or the - <br />Contract TJmeS but is evidence that the parties expect that <br />the ohattge ordered or documented by a Work Change ' <br />Directiw will be incorporated in a subsequently issued _ ( <br />Change Order following negotiations by the parties as to <br />its effect, if any, on the Contract Price or Contract <br />Times. <br /> <br />50. Written Amendment--A written statement <br />modifying the Contract Documents, signed by OWNER <br />and CONTRACTOR on or after the Effective Date of the _ <br />Agreement and normally dealing with the nonengineering <br />or nontechnical rather than strictly construction-related <br />aspects of the Contract.OOC11Ifienta. <br /> <br />1.02 Terminology <br />A. Intent of Cenain Terms or Adjective3 <br /> <br />1. Whenever in the Contract Documents the terms <br />"as allowed," "as approved, to' or terms of like effect or <br />import are used, or the adjectives "reasonable," <br />"suitable," "acceptable,"' "proper," "satisfactory,. or <br />adjectives of like effect or import are used to describe an <br />action or determination of ENGINEER as to the Work, it <br />is intended that such action or determination will be solely <br />to evaluate, in general, the completed Work for <br />compliance with the requirements of and information in - <br />the Contract Documents and conformance with the design <br />concept of the completed Project as a functioning whole <br />as shown or indicated in the Contract Documents (unless <br />there is a specific statement indicating otherwise). The <br /> <br />00700 - 8 <br />