Laserfiche WebLink
<br />". <br /> <br />- . <br /> <br />use of any such term or adjective shall not be effective to <br />assign to ENGINEER any duty or authority to supervise <br />or direct the performance of the Wor~ or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 9.10 or any other provision of the <br />Contract Documents. <br /> <br />B. Day <br /> <br />ARTICLE 2 - PRELiMINARY MATTERS <br /> <br />2.01 Delivery of Bonds <br /> <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER, CONTRACTOR shall also deliver <br />to OWNER such Bonds as CONTRACTOR may be required <br />to furnish. <br /> <br />1. The word "day" shall constitute a calendar day <br />of 24 hours measured from midnight to the next midnight. 2.02 Copies of Documents <br /> <br />: - <br /> <br />C. Defective <br /> <br />f.:':"! <br />~ ~ <br /> <br />1. The word "defective," when modifying the word <br />"Work," refers to Work that is unsatisfactory, faulty, or <br />deficient in that it does not conform to the Contract <br />Documents or does not meet the requirements of any <br />inspection, reference standard, test, or approval referred <br />to in the Contract Documents, or has been damaged prior <br />to ENGINEER's recommendation of final payment <br />(unless responsibility for the protection thereof has been <br />assUDled by OWNER at Substantial Completion in accor- <br />dance with paragraph 14.04 or 14.05). <br /> <br />D. Furnish, InstaU, Perform, Provide <br /> <br />'0\ <br />It. <br /> <br />.1. The word "furnish," when used in connection <br />with services, materials, or equipment, shall mean to <br />supply and deliver said services, II1ilterials, or equipment, <br />to the Site (or SOR other specified location) ready for use <br />or installation and in usable or operable condition. <br /> <br />~ "~, <br />: --- <br /> <br />2. The word "install," when used in connection <br />with services, materials, or equipment, shall mean to put <br />into use or place in final position said services, materials, <br />or equipment complete and ready for intended USe. <br /> <br />3. The words "perform" or "provide," when used <br />in connection with services, materials, or equipment, <br />shall mean to furnish and install said services, materials, <br />or equipmC?nt complete and ready for intended use. <br /> <br />4. When "furnish," "install," "perform," or "pro- <br />vide" is not used in connection with services, materials, <br />or equipment in a context clearly requiring an obligation <br />of CONTRACTOR, "provide" "is implied. <br /> <br />~ <br /> <br />E. Unless stated otherwise in the Contract Documents, <br />words or phrases which have a well-known technical or <br />, construction industry or trade meaning are used in the <br />Contract Documents in accordance with such recognized <br />me~. <br /> <br />A. OWNER shall furnish to CONTRACTOR up to ten <br />copies of the Contract Documents. Additionai copies will be <br />furnished upon request at the cost of reproduction. <br /> <br />2.03 Commencement of Contract Times; Notice to Proceed <br /> <br />A. The Contract Times will commence to run on the <br />thirtieth day after the Effective Date of the Agreement or, if <br />a Notice to Proceed is given, on the day indicated in the <br />Notice to Proceed. A Notice to Proceed may be given at any <br />time within 30 days after the Effective Date of the <br />Agreement. In no eve~t will the Contract Times commence <br />to run later than the sixtieth day after the day of Bid opening <br />or the thirtieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br /> <br />2.04 Starting the Work ,', , <br /> <br />, ,. <br /> <br />A. CONTRACTOR shall start to perform the Work on <br />the date when the Contract Times commence to run. No <br />Work. shall be done at the Site prior to the date on which the <br />Contract Times commence to run. <br /> <br />2.0S Before Starting Construction <br /> <br />A. CONl'R.ACFOR's Review of Contract Documents: <br />Before undertaking each part of the Work, CONTRACTOR <br />shall carefully study and compare the Contract Documents <br />and check and verify pertinent figures therein and all <br />applicable field measurements. CONTRACTOR shall <br />promptly report in writing to ENGINEER any conflict, error, <br />ambiguity. or discrepancy which CONTRACTOR may <br />discover and shall obtain a written interpretation or <br />clarification from ENGINEER before proceeding with any <br />Work affected thereby; hoWever, CONTRACTOR shall not <br />be liable to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or discrepancy in the Contract <br />Documents unless CONTRACTOR knew or reasonably <br />should have known thereof. <br /> <br />B. Preliminary Schedules: Within ten days after the <br />Effective Date of the Agreement (unless otherwise specified <br /> <br />00700 - 9 <br />