Laserfiche WebLink
<br />(d) The SWQ permit applicant or, if the SWQ permit has already been issued, the SWQ <br />permittee, shall pay all recording fees required by the county clerk's office. <br /> <br />Sees. 34-266-34-279. Reserved. <br /> <br />DIVISION 3. STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION <br />ACTIVITY <br /> <br />Sec. 34-280. Applicability. <br /> <br />This division shall apply to all facilities located within the city that have storm water <br />discharges associated with construction activity. <br /> <br />Sec. 34-281. Unpermitted discharges prohibited. <br /> <br />A person who is the operator of a facility that has storm water discharges associated with <br />construction activity commits an offense if the person discharges, or causes to be discharged, <br />storm water associated with construction activity without first having obtained an NPDES or <br />TPDES permit to do so. <br /> <br />Sec. 34-282. Submission of NOI. <br /> <br />(a) The operator ofa facility required to have an NPDES or TPDES permit to discharge <br />storm water associated with construction activity shall submit a certification that he has <br />submitted an NOI to the EPA or TCEQ, a copy of that NOI, and a copy ofa site plan and <br />a Stormwater Pollution Prevention Plan detailing the location of erosion control measures <br />to the city engineer or the building official prior to obtaining a construction permit for <br />that activity. <br /> <br />(b) A person commits an offense if the person operates a facility that is discharging storm <br />water associated with construction activity without having submitted a copy of the NOI <br />to do so to the city. <br /> <br />Sec. 34-283. Submission of NOT. <br /> <br />(a) If required to submit an NOT to EPA pursuant to an NPDES or TPDES permit to <br />discharge storm water associated with construction activity, an operator shall submit a <br />certification that he has submitted an NOT to the EP A or TCEQ and a copy of that NOT <br />to the city engineer at the same time the operator submits the NOT to the EP A or the <br />TCEQ as applicable. If final stabilization as required by EP A has not been achieved at the <br />time the operator submits the NOT, the operator shall also submit a copy of the NOI for <br />the operator who is assuming responsibility for the site. <br /> <br />24 <br />