Laserfiche WebLink
<br />(b) A person who is the owner or the operator of a facility that has storm water discharges <br />associated with industrial activity commits an offense if the person submits a certification <br />pursuant to 34-303 and fails to comply with the applicable standards established by the TCEQ. <br /> <br />Sec. 34-291. Submission of NOI. <br /> <br />(a) A person who is the owner or the operator of a facility that has storm water discharges <br />associated with industrial activity shall submit to the city engineer a copy of: <br /> <br />(1) The notice of intent to obtain coverage under TPDES permit number TXR050000 <br />for the facility; <br /> <br />(2) The notice of intent to obtain coverage under any other TPDES general storm <br />water permit for the facility; <br /> <br />(3) The individual TPDES storm water permit for the facility; or <br /> <br />(4) The no exposure certification form submitted to TCEQ for the facility pursuant to <br />the provisions ofTPDES permit number TXR050000. <br /> <br />(b) A copy of the NOI or the no exposure certification form shall be submitted to the city no <br />later than 14 calendar days after filing the NOI or no exposure form with the TCEQ for <br />such coverage. A copy of the individual TPDES permit shall be submitted to the city no <br />later than 14 calendar days after TCEQ signs the permit. <br /> <br />(b) A copy of the approved Stormwater Pollution Prevention Plan when the permit is issued. <br /> <br />Sec. 34-292. Submission of NOT. <br /> <br />( a) A person who is the owner or operator of a facility that has storm water discharges <br />associated with industrial activity shall submit to the city engineer a copy of an NOT for <br />the facility which shall include any information required for notice of termination under <br />TPDES permit number TXR050000 or any other TPDES general storm water permit, <br />whenever: <br /> <br />(1) All storm water discharges associated with industrial activity are eliminated at the <br />facility; or <br /> <br />(2) The operator of the facility changes. <br /> <br />If the NOT is being submitted because the operator of the facility has changed, a copy of the <br />NOI for the new operator shall be submitted with the NOT. <br /> <br />26 <br />