Laserfiche WebLink
• • <br />Staff Report Pecan Crossing Preliminary Plat December 7, 1995 <br />Pecan Crossing is a proposed residential subdivision which is to be located on the north side <br />of Fairmont Parkway, approximately 1, 800 feet west of Underwood Road. A General Plan <br />of the subdivision was approved by the Commission on February 17, 1994. (See Map <br />Exhibit A) <br />The developer received approval of the Preliminary Plat of Section I of the subdivision in <br />April of 1994. As specified by the Development Ordinance, Preliminary Plat approvals are <br />valid for a period of one year. Since a year has elapsed without a Final Plat being <br />submitted, the original Preliminary Plat approval has expired. Also, since the date of <br />original approval, the developer has made some minor revisions to the Section I plat. Based <br />on these revisions, the applicant, rather than asking for an extension of his first approval, <br />is seeking a new approval for the revised plat. (See Map Exhibit B) <br />Staff, using Appendix D of Development Ordinance 1444 as a guide, has reviewed the <br />Preliminary Plat and found it to be in compliance with applicable ordinance requirements. <br />A checklist detailing the items reviewed is attached and follows this report. <br />As noted on the checklist, survey monumentation has not been shown on the Preliminary <br />Plat. Staff would recommend that monument locations be noted on the Final Plat <br />document. Inclusion of monument location would be a condition of Final Plat approval. <br />An additional consideration is access to Spring Gully and the subdivision detention pond. <br />The original Preliminary Plat included a reserve dedicated to use as a private subdivision <br />recreational area. This area has been reconfigured as two lots for homesites. This has <br />eliminated the Section I access path to Spring Gully. This access is important for two <br />reasons. <br />• Unless an additional easement is dedicated on a subsequent section plat, the <br />Spring Gully drainage easement will provide primary access to the detention <br />pond located at the north end of the subdivision. As is noted on Plat Sheet <br />#2, maintenance of this facility is the responsibility of the Homeowner's <br />Association. (This note should be amended to also document homeowner's <br />association ownership of the detention facility. Inclusion of the amended <br />language should be a condition of Final Plat approval.) <br />• The Spring Gully easement, in the future may be included in a proposed <br />system of pedestrian paths that will connect various recreational facilities. <br />While these issues do not necessarily have to be resolved in conjunction with the Section <br />I approval, they will have to be addressed. Staff does feel this is an appropriate time to <br />initiate discussion. Additionally, we would point out the three 10 foot drainage easements <br />that connect Section I to Spring Gully. It may be possible to designate one of these <br />easements as a drainage and pedestrian access easement. <br />Finally, staff would note that Section 5.02 of the Development Ordinance empowers the <br />