My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-03-1998 Special Called Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Agendas 1000-01
>
Planning and Zoning Commission
>
1990's
>
1998
>
09-03-1998 Special Called Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2010 4:52:52 PM
Creation date
6/29/2010 4:49:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agendas
Date
9/3/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Staff Report Summer Winds, Section II September 3, 1998 <br />Preliminary Plat <br />Reauested Bv: Eazl W. Wilburn, Jr., Secretazy for Summer Winds, LLC <br />Requested For: A 15.0780 Acre Tract of land being Outlots 702 and 703 to the W. B. <br />Lawrence Subdivision, Volume 83, Page 344, H.C.D.R. out of the William <br />M. Jones Survey, A-482, LaPorte, Harris County, Texas. <br />Present Zoning: Low Density Residential (R-1) <br />Requested Use: Residential Subdivision <br />Background: Summer Winds is a residential subdivision located off Underwood Road and <br />located between Spencer Highway and Fairmont Parkway. Section II <br />includes 4 blocks, 561ots and one restricted reserve. <br />Analysis: For general information purposes, staff has listed items below that need to be <br />addressed by the developer with the submittal of the final plat. <br />• A reference that the detention pond ownership and maintenance by the <br />Homeowner's Association shall be stated in writing on the final plat. <br />Language in the convenants and on the face of the plat shall <br />dedicate/transfer ownership of the detention reserve to the Homeowners <br />Association. <br />• A reference that the developer is responsible for construction and <br />installation of sidewalks within the subdivision should be stated in <br />writing on the front of the final plat. (If sidewalks are required by the <br />Planning &Zoning Commission) <br />• A HL&P street light layout plan and letter stating costs from HL&P is <br />provided for review by the City. <br />• Payment for street lighting cost should be made to the City. <br />• Approval from the franchise utilities regarding the size and location of <br />the proposed utility easements are provided for City review and <br />approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.