Laserfiche WebLink
f. Developer/owner signature block. <br /> g. City approval signature block. <br /> h. Scale of plan in engineering format. <br /> i. North arrow. <br /> j. Vicinity map showing relation of development to surrounding streets,railroads and watercourses. <br /> k. Perimeter boundary of the property. <br /> I. Identification of each phase of development and proposed land use/s for each phase. <br /> m. Label adjacent subdivisions,streets,easements,water courses,acreage tracts,and other natural and <br /> manmade features. <br /> n. Show land contours at one-foot intervals. <br /> o. Identify required building lines adjacent to all existing or proposed public and private streets and <br /> alleys. <br /> p. If building locations are known, include the footprint of each building, indicating the building type, <br /> building height,number of stories,floor area,and density of residential development. <br /> q. Show rights-of-way for all streets and alleys either existing or proposed within or adjacent to the <br /> general plan boundaries.Indicate right-of-way width of all streets as identified in the PICM.Identify <br /> whether streets are intended to be public or private. <br /> r. Indicate approximate location,widths,and types for all easements whether existing or proposed within <br /> or adjacent to the general plan boundaries. <br /> s. Identify the location of all existing public utilities within or adjacent to the general plan boundaries <br /> and how each phase of development will connect with those utilities. <br /> t. Show approximate boundary of flood hazard area as taken from the official FEMA flood insurance <br /> rate maps adopted by the city or other sources approved by the Director. <br /> u. Stormwater drainage plan showing general drainage basins and possible location for on-site detention <br /> if required. <br /> v. Traffic study or written documentation from the director that the development does not necessitate a <br /> traffic study. <br /> w. Other information required by the director. <br /> (e) Within 30 days of submittal of an administratively complete application,the director shall schedule the general <br /> plan on the planning and zoning commission agenda for review by the commission. <br /> (f) General applications shall comply with all applicable city ordinances and statutes prior to approval by the <br /> commission.The commission shall review the general plan and take one of the following actions: <br /> (1) Approve the general plan as filed. Commission approval of the general plan authorizes the developer to <br /> file a preliminary plat or a development site plan. <br /> (2) Conditionally approve the general plan as filed,provided,the reasons for such conditional approval are <br /> stated in writing and a copy of the statement is signed by the chairman of the commission. Commission <br /> conditional approval requires submission of an amended General Plan and additional documentation as <br /> specified by the planning commission for final commission approval,which may be filed concurrently with <br /> the next preliminary plat or development site plan,as the case may be. <br /> (3) Disapprove the general plan as filed,provided,the reasons for such disapproval are stated in writing and a <br /> copy of the statement is signed by the chairman of the commission.Commission disapproval of a general <br /> plan requires submission of a new general plan. <br /> (g) The original approved mylar of the general plan shall be retained by the department in the official files of the <br /> commission. No subsequent plan or plat will be approved until the original mylar has been delivered to the <br /> department. <br />