Laserfiche WebLink
indicates points of discharge to the POTW from the regulated <br />processes. <br />4. Flow Measurements. Information showing the measured average <br />daily and maximum daily flow, in gallons per day, to the POTW <br />from regulated process streams and other streams, as necessary, <br />to allow use of the combined waste stream formula set out in 40 <br />CFR 403.6 (e). <br />5. Measurement of Pollutants. <br />a. Identify the categorical pretreatment standards applicable <br />to each regulated process. <br />b. Submit the results of sampling and analysis identifying the <br />nature and concentration (and / or mass, where required <br />by the standard or by the City) of regulated pollutants in <br />the discharge form each regulated process. <br />Instantaneous, daily maximum and long term average <br />concentrations (or mass, where required) shall be <br />reported. The sample shall be representative of daily <br />operations and shall be analyzed in accordance with <br />sample procedures set out in S^iOR 640 74-110. In cases <br />where the standard requires compliance with a Best <br />Management Practice or pollution prevention alternative, <br />the IU shall submit documentation as required by the CA <br />of the applicable standards to determine compliance with <br />the standard. <br />C. Sampling must be performed in accordance with <br />procedures set out in Sectie^ 640 and Section 6.1174-110 <br />and 74-111. <br />6. Certification. A statement reviewed by the industrial user's <br />authorized representative and certified by the qualified <br />professional, indicating whether pretreatment standards are <br />being met on a consistent basis and, if not, whether additional <br />operation and maintenance ( O & M ) and/or additional <br />pretreatment is required to meet the pretreatment standards and <br />requirements. <br />7. Compliance Schedule. If additional pretreatment and/or O&M <br />will be required to meet the pretreatment standards; the shortest <br />schedule by which the industrial user will provide such additional <br />pretreatment and/or O&M. The completion of this schedule shall <br />31 <br />