Laserfiche WebLink
not be later than the compliance date established for the <br />applicable pretreatment standard. A compliance schedule <br />pursuant to this section must meet the requirements set out in <br />Seetme 74-102 of this nee article . <br />8. All Baseline Monitoring Reports must be signed and certified in <br />accordance with Ste„ 4.6 74-114. <br />74-102 *-.2-4Compliance Schedule Progress Report <br />The following condition shall apply to the schedule required by Seetien 64 (b)(7) <br />74-101 of the City's or-dinance this article. The schedule shall contain progress <br />increments in the form of dates for the commencement and completion of major <br />events leading to the construction and operation of additional pretreatment <br />required for the user to meet the applicable pretreatment standards (such <br />events include hiring an engineer, completing preliminary and final plans, <br />executing contracts for major components, commencing and completing <br />construction, beginning and conducting routine operation). No increment <br />referred to above shall exceed nine (9) months. The industrial user shall submit <br />a progress report to the Director no later than fourteen (14) days following each <br />date in the schedule and the final date of compliance, including as a minimum, <br />whether or not it complied with the increment of progress, the reason for any <br />delay, and if appropriate, the steps taken by the industrial user to return to the <br />established schedule. In no event shall more than nine -(9) months elapse <br />between such progress reports to the Director. <br />74-103{ - . Report on Compliance with Categorical Pretreatment Standard Deadlines <br />Within ninety (90) days following the date for completion with applicable <br />categorical pretreatment standards, or in the case of a new source following the <br />commencement of the introduction of wastewater into the POTW , any <br />industrial user subject to pretreatment standards and requirements shall submit <br />to the City a report containing the information described in Seetion 6.1 (9)(4 6) <br />74-101. For industrial user subject to equivalent mass or concentration limits <br />established in accordance with the procedures in 40CFR 403.6(c), this report <br />shall contain reasonable measure of the industrial user's long-term production <br />rate. For all other industrial users subject to categorical pretreatment standards <br />expressed in term allowable pollutant discharge per unit of production ( or other <br />measure of operation), this report shall include the industrial user's actual <br />production during the appropriate sampling period. All compliance reports must <br />be signed and certified in accordance with Section 4.6 74-76. <br />32 <br />