My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2021-3822 Grantng SCUP No. 20-91000003, for residential and commercial development located at the NE corner of Wharton Weems
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2020's
>
2021
>
O-2021-3822 Grantng SCUP No. 20-91000003, for residential and commercial development located at the NE corner of Wharton Weems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 9:07:22 AM
Creation date
9/16/2021 8:27:02 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Legislative No.
O-2021-3822
Date
4/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parking stalls along the Highway 146 frontage. This should be accommodated by relocating <br /> buildings in a manner that places parking on the side of the building or internal to the <br /> development. If this is not possible, the developer may install planter islands at 1 per 10 <br /> spaces for both rows of parking along a drive aisle parallel to Highway 146. Additionally, <br /> hedges shall be planted at 3-foot on center in two rows of plantings. Such hedge row shall be <br /> installed with a variety of plant material to provide visual diversity of plant materials. <br /> 10. For the commercial portion of the development, parking shall be calculated based on the <br /> aggregate amount of parking required and proposed;joint parking is allowed. <br /> 11. All public streets internal to the development site shall be constructed in accordance with the <br /> city's Public Improvement Criteria Manual and shall be dedicated to the city. <br /> 12. Any proposed variances to public right-of-way improvements must be reviewed and approved <br /> by the Public Works Department prior to plat submittal. <br /> 13. Access to any public right-of-way is subject to the requirements of Section 106-835, Figure 10-3 <br /> and will be reviewed at the time of Site Development Plan. TXDOT right-of-way access permits <br /> shall be presented prior to permit issuance for all driveways requested on Highway 146. Maximum <br /> driveway widths shall be provided in compliance with city code requirements. <br /> 14. The developer will be required to submit for approval by the City Engineer, a drainage report <br /> indicating how the proposed development will accommodate the requirements for storm water <br /> detention in accordance with the city's Public Improvement Criteria Manual, or if discharging in a <br /> TXDOT or Harris County system, approval by such authority. <br /> 15. All necessary documentation for building permit review must be submitted in conjunction with the <br /> city's building permit application process. <br /> 16. A traffic impact analysis, performed by a licensed engineer agreed to by both the City and the <br /> applicant, shall be required. If any mitigation is required by the study, the applicant will be <br /> responsible for their proportion of the impact. All contributions would be subject to reimbursement <br /> through the TIRZ, pursuant to approval by the TIRZ Board. <br /> 17. If extension of any public water or sanitary sewer line is required as part of this development, the <br /> applicant will be required to execute a utility extension agreement with the city and install such <br /> improvements at the cost of the developer. <br /> 18. A photometric plan will be required at the time of commercial site plan submittal that will identify site <br /> lighting and the lumens proposed across the site. Lighting will need to be in compliance with the <br /> requirements of Section 106-310, A, of the city's Code of Ordinances. <br /> 19. Any substantive modifications to this Special Conditional Use Permit will require an <br /> amendment to this SCUP in accordance with Chapter 106, "Zoning" of the City's Code of <br /> Ordinances. <br /> Failure to start construction of the site within 12 months after issuance or as scheduled under the terms of <br /> a special conditional use permit shall void the permit as approved, except upon an extension of time <br /> granted after application to the Planning and Zoning Commission. <br /> If contract or agreement is terminated after completion of any stage and there is ample evidence that further <br /> development is not contemplated, the ordinance establishing such special conditional use permit may be <br /> rescinded by the City Council, upon its own motion or upon the recommendation of the Planning and Zoning <br /> Commission of the City of La Porte, and the previous zoning of the entire tract shall be in full effect on the <br /> portion which is undeveloped. <br /> Validation Date: - to - 2 <br /> Director of Planning and Development City Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.