<br />.
<br />
<br />e
<br />
<br />for the supply of electric power from and to the Switchyard to locations to and from outside of
<br />the Plant Land and which are currently located within the electric transmission easement areas as
<br />described in the schedules referred to in Section 2.6 of the Easement Agreement, it being agreed,
<br />for the avoidance of doubt, that the foregoing does not include any of the foregoing types of
<br />property insofar as they relate to electric lines connecting the Switchyard with the Plant Property
<br />or other points located inside the Property, or which opc,rate at below 60kV and extend to
<br />locations outside of the Plant Land, which property is covered in (b) below; said excluded
<br />properties of Grantor above described being herein collectively referred to as "Grantor's
<br />Transmission PropertY";
<br />
<br />,
<br />
<br />(b) Certain Electrical Imorovements Within Plant Land:
<br />
<br />(i) one or more lines of towers, poles and other structures, with necessary and
<br />convenient foundations,
<br />
<br />(ii)
<br />circuits,
<br />
<br />overhead wires and cables, including ground wires and communication
<br />
<br />(Hi) guy wires and anchors, insulators and crossanns' placed on or used in
<br />connection with the structures described in (i) above, and
<br />
<br />(iv) other fixtures, appliances and appurtenances connected with any of the
<br />foregoing, necessary or convenient for the construction, operation, regulation, control,
<br />grounding and maintenance of the Switchyard, electric lines or above-described
<br />communications circuits for the purpose of transmitting, distributing, regulating and
<br />. controlling electric energy,
<br />
<br />for (A) the supply of electric power at any voltage to the land described in SCHEDULE 2A and
<br />SCHEDULE 2B, (B) the supply of electric power at any voltage from the land described in
<br />SCHEDULE 2A and SCHEDULE 2B to the Plant Land or to other portions of the land described
<br />in SCHEDULE 2A and SCHEDULE 2B, (C) the supply of electric power below 60kV from the
<br />land described in SCHEDULE 2A and SCHEDULE 2B or from land outside the Plant Land to
<br />the first meter connection, if any, within the Plant Land which is currently in place or which may
<br />hereafter be installed, or (D) .thesupply of electric power operating below 60kV from and to the
<br />land described in SCHEDULE 2A and SCHEDULE 2B to and from locations outside of the land
<br />described in SCHEDULE lA, SCHEDULE IB, and SCHEDULE lC. a portion of which
<br />property described in (i) ,through (iv) above is currently located within the electric service
<br />easement areas described in the Schedules referred to in Section 2.5 of the Easement Agreement
<br />and which includes, without limitation, the specific lines, towers, poles and foundations located
<br />within said easements which are described in the LIST OF PROPERTY AND SCHEDULES
<br />A'ITACHED TO DEED and in SCHEDULE 4, each attached hereto;
<br />
<br />(c) Certain Imorovements Within Microwave Tower Tract: All of the towers, poles,
<br />buildings and other structures, cables, lines, wires, conduits, control trenches, cable trays, pull
<br />boxe~ terminal cabinets, poles, antennae, dishes, camera systems, and related facilities and
<br />equipment (including, without limitation, fiber optic multiplexors, microwave terminals, DC
<br />power plants, telephon~ switches (PBX's), data concentrators, routers, ground potential rise
<br />
<br />'HOU03:827974.4
<br />
<br />4
<br />
|