My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Houston Lighting & Power Company Easement
LaPorte
>
City Secretary
>
.EASEMENTS
>
1990's
>
1993
>
Houston Lighting & Power Company Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 8:56:47 AM
Creation date
11/26/2024 9:26:55 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Easements
Date
7/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.-... ~ . .... <br /> <br />e <br /> <br />e <br /> <br />G9'i&Ii-56.::"'1337 <br />SHC/s 08/14/92 <br /> <br />. <br />, <br /> <br />.- <br /> <br />EXHIBIT C <br />PAGE 3 OF 3 <br /> <br />15. Upon completion of the pipeline installation, the Right-of-Way <br />shall be graded to a smooth finish and all excess material will be <br />either removed from the Right-of-Yay or distributed on the Right-of- <br />Yay as directed by Houston Lighting & Power Company's inspector. All <br />trash or any other objectionable materials resulting from construction <br />shall be removed from the Right-of-Yay by the contractor. The natural <br />drainage pattern of the Right-of-Way shall be maintained, and all <br />previously existing ditches shall be re-estab1ished. <br /> <br />16. The e1evation'beneath Houston Lighting & Power Company's trans- <br />mission towers within the limits of the proposed work shall be main- <br />tained equal to or greater than the surrounding finished grade eleva- <br />tions. Spoils material shall not exceed the elevation of the concrete <br />cap of the tower foundation. The spoil material beneath the towers <br />shall be compacted with a tamper or hand vibratory equipment and <br />shaped to a smooth finish to provide proper drainage. Absolutely no <br />self-propelled equipment shall be allowed directly beneath the tower. <br /> <br />17. Grantee, its successors and assigns, shall guarantee all work <br />performed by itself or its agent against any and all defects in <br />workmanship and shall, at its sole cost and expense, make repairs as <br />may be necessary to remedy such defects. <br /> <br />Revised 07-23-81 <br /> <br />.. <br /> <br />-. .~. <br /> <br />Relum.'.: CitySecl8taly <br />. City of La PotIft <br />P. O. Box 11,. <br />La Porte, TX 77172-1111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.