My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Coastal Water Authority-grantor of pedestrian and bicycle easement
LaPorte
>
City Secretary
>
.EASEMENTS
>
2000's
>
2011
>
Coastal Water Authority-grantor of pedestrian and bicycle easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2011 11:04:25 AM
Creation date
11/26/2024 9:27:14 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Easements
Date
1/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J. CW A STAFF. CW A'S CONSULTANT ENGINEER. PIPELINE OWNER'S <br />REPRESENTATIVES AND CONSTRUCTION INSPECTORS <br /> <br />1. A pre-construction conference between representatives of CW A, CW A's consultant <br /> <br />Engineer, the Pipeline Owner's representatives and Construction Inspectors will be <br /> <br />required before any work commences on the CW A right-of-way. <br /> <br />2. The pipeline owner shall assign a qualified inspector to be on site at all times during the <br /> <br />performance of construction operations directed at crossing CW A's rights-of-way. The <br /> <br />inspector shall order the cessation of the work when so requested by CW A's field <br /> <br />~ <br /> <br />/~. <br />~.I <br />~rJ <br />~'l <br /> <br />inspector. <br /> <br />3. The pipeline owner shall keep CW A's representatives advised at all times when working <br /> <br />Q <br />~l <br />I <br />I <br />~rl <br />V'" <br />CJ <br /> <br />adjacent to or across CW A's rights-of-way. No work shall be done on CW A's right-of- <br /> <br />way in the absence ofCW A's representatives unless otherwise authorized. <br /> <br />4. Each crossing approved by CW A may have special specifications, in addition to these <br /> <br />standard specifications concerning clearances, dewatering, boring operations, open <br /> <br />ji!., <br />~. <br /> <br />trenching, shoring, earth slides, settlement and any other anticipated construction <br /> <br />problems. <br /> <br />K ADMINISTRATION AND CONSTRUCTION INSPECTION FEES <br /> <br />There will be a fee in the amount of three hundred and fifty dollars ($350.00) for all pipeline <br /> <br />crossings of CW A right-of-way to be paid by corporate check PRIOR to the start of <br /> <br />construction activities. BANK DRAFTS ARE NOT ACCEPTABLE. <br /> <br />Page 11 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.