My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
10-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 8:48:20 AM
Creation date
3/7/2025 12:36:49 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Lorenzo Wingate <br />City of La Porte <br />August 31, 2021 <br /> <br />Page 6 <br /> Detention Pond Grading Plan <br /> Detention Pond Horizontal Control Plan <br /> Cross-Sections with Cut and Fill Calculations <br /> Demolition Plans <br /> Construction Access <br /> Traffic Control Plans / Construction Phasing Plan <br /> Traffic Control Details <br /> Storm Water Pollution Prevention Plans <br /> Standard Details <br /> <br />Task 6: Geotechnical Analysis <br /> <br />Halff has contracted Ninyo and Moore to perform geotechnical services on this project. Ninyo and Moore <br />will drill seven (7) borings to a depth of 25 feet and collect soil samples continuously to a depth of 20 feet <br />and at 5-foot intervals after. Laboratory testing will analyze soil samples and a geotechnical report will be <br />prepared outlining dewatering recommendations, earthwork recommendations, slope stability analysis, and <br />erosion and slope paving recommendations. This proposal also includes effort necessary for three (3) days <br />of clearing and grubbing for site access to conduct the field investigation. Please see Attachment ÐFÑ for <br />more details. <br /> <br />Task 7: Bid Phase Services <br /> <br />a) Attendance at the pre-bid meeting and compilation of notes for distribution. <br />b) Preparation of pre-bid responses and responding to questions. <br />c) Attendance at the bid review meeting and providing input on the selection process. <br />d) Preparation of bid recommendation letter and bid tabulation summary. <br /> <br />Construction Phase Services <br />Task 8: Construction Phase Services <br />a) Responding to submittals as requested by the City of La Porte <br />b) Responding to RFI as requested by the City of La Porte <br />c) Design changes/plan revisions as requested by the City of La Porte <br />d) Preparation of record drawings <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.