My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
10-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 8:48:20 AM
Creation date
3/7/2025 12:36:49 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Lorenzo Wingate <br />City of La Porte <br />August 31, 2021 <br /> <br />Page 7 <br />Additional Services: <br />The following services have been scoped to be authorized on an as-needed basis line item by line item. <br />Task 9A: Section 404 Permitting <br />If the selected project location is determined to contain WOTUS, authorization under Section 404 of the <br />Clean Water Act (Section 404) for regulated activities (i.e. placement of fill) below the Ordinary High- <br />Water Mark (OHWM) would be required prior to beginning construction. HalffÓs Environmental Team will <br />work with engineering and USACE to secure the appropriate permit to allow construction of the proposed <br />detention pond. This task will include preparation of all permit components as outlined in ENG Form 4345, <br />as follows: <br /> Name, address, and telephone numbers of the prospective permittee; <br /> Location of the proposed project; <br /> A description of the proposed project; the projectÓs purpose; direct and indirect adverse <br />environmental effects the project would cause, including the anticipated amount of loss <br />of water of the United States expected to result from the activity, in acres, linear feet, <br />or other appropriate unit of measure; <br /> Project schedule; <br /> Names and addresses of adjoining property owners; <br /> List of authorizations required by other federal, interstate, state, or local agencies for <br />the work, including approvals or denials already received; <br /> Delineation of waters of the United States (see task description); <br /> Section 404(b)(1) alternatives analysis with discussion of avoidance and minimization <br />measures; <br /> Compensatory mitigation plan Î It is anticipated that the proposed project will involve <br />appropriate avoidance and minimization of adverse impacts to aquatic resources. In the <br />event construction of the detention pond would result in permanent adverse impacts to <br />aquatic function and values the applicant would be require to supply compensatory <br />mitigation. The USACE preferred method (by rule) is purchase of mitigation bank <br />credits. However, in the absence of appropriate bank credits, the Applicant may <br />evaluate on-site/in-kind mitigation alternatives to achieve appropriate mitigation. <br />Mitigation requirements will be informed by the functional value of the wetlands as <br />determined during the delineation, post-project conditional estimates, and pre- <br />application discussions with the USACE to ensure the that proposed project meets <br />compensatory mitigation requirements and the purpose and need of the project <br />(conveyance improvements and flood risk reduction); <br /> Threatened and endangered species assessment (see task description); and <br /> Cultural resources assessment (see task description). <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.