My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-29-15 Drainage & Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2015
>
06-29-15 Drainage & Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2015 10:22:12 AM
Creation date
3/7/2025 1:12:41 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
6/29/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer/ Inspection Service Manager Bob Eng provided a summary for discussion of Drainage <br />Projects and Administrative Drainage Projects in the City of La Porte. <br /> <br /> <br />F216 Phase II Watershed Improvements .) <br /> <br />City Engineer/Inspection Services Manager Bob Eng provided an update on the F216 Phase II <br /> <br /> <br />Vice-Chairman Martin asked the timeline for completion of the project. Mr. Eng responded he does not <br />have a completion date and will have to advise the Committee at a later date. <br /> <br />N. P Street Culvert Replacement Project <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the N. P Street Culvert <br />Replacement Project. Alternate Member Earp asked how long it will take to <br />maintenance easement on the east side of the existing ditch as per the request of Harris County Flood <br />Control District. Mr. Eng responded a purchase order has been received recently and it will be done <br />within the next two weeks. <br />N. D Street to Sens Road Ditch De-Silting Project <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the N. D Street to Sens <br />Road Ditch De-Silting project. There were no questions from Committee Members. <br /> <br />Browning/Golden Drainage Improvements Project <br /> <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the Browning/Golden <br />Drainage Improvements Project. Committee Member Leonard asked after re-grading the ditch and <br />replacing culverts to facilitate drainage to N. P Street are there any foreseeable downstream or flooding <br />problems with additional water flow in the area. Mr. Eng responded he does not anticipate any issues. <br />D Street Ultimate Outfall Project <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the D Street Ultimate Outfall <br />Project. Committee Member Martin asked if there are any plans for the empty acreage surrounding the <br />project. Planning and Development Director Tim Tietjens responded the City has plans to partner with <br />Trees for Houston and plant trees along the D Street ditch. <br />TX Dot/Broadway Remote Maintenance Contract <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the TX Dot/Broadway <br />Remote Maintenance Contract. Committee Member Martin asked if the culverts will be replaced. Mr. <br />Eng responded yes. Committee Member Martin requested staff to investigate the process of filling the <br />ditch from Pine Bluff south to Bayside Dr., and report back to the Committee. <br />CLP Bulkhead <br /> <br />Page 2 of 4 <br />March 30, 2015 <br /> Drainage and Flooding Committee Minutes <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.