My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-29-15 Drainage & Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2015
>
06-29-15 Drainage & Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2015 10:22:12 AM
Creation date
3/7/2025 1:12:41 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
6/29/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer/Inspection Service Manager Bob Eng provided an update on the CLP Bulkhead at Happy <br />Harbor. Committee Member Martin asked the total length of the waterfront property. Planning and <br />Development Director Tim Tietjens responded roughly 300 or more feet not including Klein Retreat or <br />any other property south. <br /> <br />rd <br />S. 3 Street Project (Fairmont to Main) <br /> <br />rd <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the S. 3 Street (Fairmont <br />to Main) Project. Chairman Clausen asked the expected completed date for the project. Public Works <br />Director Dave Mick responded the end of summer 2015. <br /> <br />W. D Street Channel Improvements. <br /> <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the W. D Street Channel <br />Improvements Project. There were no questions from Committee Members. <br /> <br />W. D Street Channel Protection <br /> <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the W. D Street Channel <br />Protection Project. There were no questions from Committee Members. <br /> <br />F101 Drainage Channel (at Pipeline Corridor) <br /> <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the F101 Drainage Channel <br />(at Pipeline Corridor) Project. There were no questions from Committee Members. <br /> <br />Brookglen Detention Basins <br /> <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the Brookglen Detention <br />Basins Project. <br /> <br />Committee member Engelken asked for an update on the Brookglen Buy-Outs. Planning and <br />Development Director Tim Tietjens responded all of the section in Gladewyne Court has been sold with <br />the exception of one lot, and roughly thirteen other lots remaining north and south of Oakhaven; south <br />of Ashwyne and east of Somerton. Committee member Engelken commented the maintenance issue of <br />lots not being mowed by Harris County Flood Control District still exist and advised he has heard from <br />several citizens regarding the issue. Committee member Engelken also commented he has concerns <br />with Harris County Flood Control not and <br />directed staff to send a letter to the Department of Justice. In addition, Committee member Engelken <br />advised a homeowner at 3315 would like to install a fence at their expense on Harris County Flood <br />Control property in order to keep their property from being vandalized. Public Works Director Dave Mick <br />advised he will contact Harris County Precinct 2 regarding the Interlocal Agreement for eight (8) <br />mowing cycles to the Brookglen Subdivision parcels owned and maintained by Harris County Flood <br />Control District. <br /> <br />Chairman Clausen agreed with Committee member Engelken and directed staff to add an item to a <br />future City Council meeting to discuss sending a letter to the Justice Department regarding <br />maintenance concerns of the Brookglen Buy-Out lots. <br /> <br />Page 3 of 4 <br />March 30, 2015 <br /> Drainage and Flooding Committee Minutes <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.