My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-11-18 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2018
>
06-11-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:32:00 PM
Creation date
3/7/2025 1:12:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
6/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR DRAINAGE COMMITTEE AGENDA ITEM <br />Agenda Date Requested: June 11, 2018 <br />Requested By: L. Wingate/D. Pennell <br />Department: Public Works <br />Report: �*, Resolution: C-Ordinance: C- <br />Exhibits : <br />Appropriation <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: <br />Amount Requested: <br />Budgeted Item: 4, YES C-NO <br />SUMMARY <br />Klotz Associates, Inc. provided a report in 2011 analyzing flooding in the Battleground Estates, which indicated <br />that flows within segments of the 1`101 Channel, north of N `P' Street, rise to a level creating capacity <br />limitations which produce frequent out of banks occurrences. The unimproved upstream channel flows into two <br />forty-two inch (42") corrugated metal pipes (CMP), which feed into the improved two 8' x 10' reinforced <br />concrete boxes downstream. LJA Engineering, Inc. provided Engineering Design Services for the recommended <br />improvements of removing the two upstream forty-two inch (42") corrugated metal pipes and extending the dual <br />8' x 10' reinforced concrete boxes across N `P' Street. Construction contract has been awarded and is <br />expected to begin by the first week of June. <br />Action Re quire d: <br />Approved for Drainage Committee Agenda <br />Corby D. Alexander, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.