My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-11-18 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2018
>
06-11-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:32:00 PM
Creation date
3/7/2025 1:12:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
6/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR DRAINAGE COMMITTEE AGENDA ITEM <br />Agenda Date Requested: June 11, 2018 <br />Requested By: L. Wingate/D. Pennell <br />Department: Public Works <br />Report: �*, Resolution: C-Ordinance: C- <br />Exhibits : <br />Appropriation <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: <br />Amount Requested: <br />Budgeted Item: 4, YES C-NO <br />SUMMARY <br />A proposed conditions hydraulic model was developed during the preliminary design for the N P Street Culvert <br />Improvement Project, which recommended replacing the upstream portion of the existing composite structure at <br />N P Street, with structures matching the downstream portion of the composite structure. That project allows for <br />full utilization of the structure's capacity, as well as protect the channel during rainfall events that produce higher <br />amounts of runoff. Per the recommendations of the Phase 1 report, a more detailed Phase 2 engineering <br />analysis of segments F101-00-00 and 1`101-08-00, that are upstream of N P Street, as well as an evaluation of <br />the roadside ditch drainage conduits within Battleground Estates should be performed to identify necessary <br />improvements to address structural flooding within the area. The more detailed study would evaluate the impacts <br />of culverts located upstream of N P Street, along F-101-00-00 resulting from the 10-, 50-, and 100-year rain <br />event. Channel improvements, and increasing culvert sizes to provide sufficient capacity within culverts along <br />the roadside ditches are the anticipated mitigation efforts. <br />Action Re quire d: <br />Approved for Drainage Committee Agenda <br />Corby D. Alexander, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.