My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:36:03 PM
Creation date
3/7/2025 1:12:43 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There were no questions from the Committee. <br />(d) Drainage Interconnect Project at Lakes at Fairmont Green — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on the Drainage Interconnect Project at Lakes <br />at Fairmont Green. <br />Chairman Martin asked which developer is doing the project. Mr. Wingate responded the <br />Brownstone Group. <br />(e) Bob's Gully — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Bob's Gully. There were no questions from <br />the Committee. <br />(f) 61" St., from Madison to W. Main Drainage Analysis — L. Wingate/D. Pennell. <br />City Engineer Lorenzo Wingate provided an update on 61h St., from Madison to W. Main Drainage <br />Analysis. There were no questions from the Committee. <br />(g) 8t" Street & D. Storm Water Conveyance Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on 81h Street & D. Storm Water Conveyance <br />Improvements. There were no questions from the Committee. <br />(h) Little Cedar Bayou F216 Phase II Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Little Cedar Bayou F216 Phase II <br />Improvements. There were no questions from the Committee. <br />(i) Little Cedar Bayou F216 Phase III Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Little Cedar Bayou F216 Phase III <br />Improvements. <br />Vice -Chairman Earp asked if the improvements are in the upcoming budget. City Manager Corby <br />Alexander responded yes. <br />(j) Browning & Golden Drainage Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update on Browning & Golden Drainage Improvements <br />and reported the project has been completed. There were no questions from the Committee. <br />(k) Airport On -site Drainage Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update Airport On -site Drainage Improvements and <br />reported the study has been completed. There were no questions from the Committee. <br />(1) Airport Off -site Drainage Improvements — L. Wingate/D. Pennell <br />City Engineer Lorenzo Wingate provided an update Airport Off -site Drainage Improvements and <br />reported the study has been completed. There were no questions from the Committee. <br />Page 2 of 4 <br />June 11, 2018 <br />Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.