My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-09-20 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2020
>
03-09-20 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 9:47:29 AM
Creation date
3/7/2025 1:12:54 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
3/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIMx. Lorenzo Wingate <br />momCiLv of La Porte <br />MAN HALFFJanuary 29, 2020 <br />Revision 3 <br />Page <br />Additional Services: <br />Task 7: Geotechnical Analysis <br />a) Geotechnical analysis services include: evaluating the soil and groundwater conditions along the <br />project alignment and providing geotechnical recommendations for proposed utility construction. <br />Pavement recommendations will also be provided. <br />Task 8: Environmental <br />a) Prepare a desktop environmental constraints analysis to provide supporting documentation for and <br />complete the EHP Checklist. This does not include agency coordination or consultation, permitting, <br />or NEPA environmental document preparation and clearance. <br />Services Not Included: <br />• Reviewing change orders or pay estimates <br />• Level of service verification in modeling efforts <br />• Construction staking <br />• Analysis of detention facilities <br />List of Assumptions: <br />All consultant fees shown on are considered to be lump sum unless otherwise noted. <br />The City of La Porte will provide any procedures, policies, data collection systems, engineering <br />guidelines, standards, and design criteria that will be required for this project. <br />The City of La Porte will retain ownership of any deliverables and electronic files created for this <br />project but will not be supplied with software applications or licenses as part of this project. <br />The scope of services does not include any preparation or attendance at any public meetings <br />pertaining to the project design or construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.