My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2-13-23
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2023
>
2-13-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:28:17 PM
Creation date
3/7/2025 1:13:12 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 6, 2023 <br />9900 Northwest Freeway <br />Mr. Andrew Moore, P.E. <br />Houston, Texas 77092 <br />Halff Associates, Inc. <br />346-286-4000 <br />www.hcfcd.org <br />14800 St. Mary's Lane, Suite 160 <br />Houston, TX77079-2943 <br />amoore@halff.com <br />SENT VIA ELECTRONIC MAIL: NO HARD COPY TO FOLLOW <br />RE:Project No. 2210120014 <br />LaPorte Interlocal Detention Pond <br />HCFCD Unit B112-00-00;Key Map 578-G,H; Pct. 2 <br />Dear Mr. Moore: <br />The referenced report has been reviewed pursuant to the HCFCD Policy, Criteria, andProcedure <br />Manualand Section 3.02 of the <br />Acceptance of The goals of the review are to provide technical support to the <br />Harris County Floodplain Administrator and to apply HCFCD policy and criteria where appropriate. <br />This review addresses issues regarding hydraulic and hydrologic drainage design criteria only. <br />Design criteria regarding the site layout of the proposed development and drainage facilities will <br />be reviewed upon submittal of site plans. <br />Our understanding of the report is described below. Please see the response contained within <br />the section. <br />HCFCD Jurisdiction <br />HCFCD criteria applies because the project meets at least one of the following conditions: <br />The project directly affects HCFCD Infrastructure. <br />The project proposes infrastructure to be maintained by HCFCD. <br />The project is located within a watershed where HCFCD has a regional project adopted <br />by Harris County Commissioners Court. <br />A technical review has been requested by Harris County. <br />Submittal Information <br />Submitted ReportConsulting Engineer <br />LaPorte Interlocal Detention PondHalff Associates, Inc. <br />October 3, 202214800 St. Mary's Lane, Suite 160 <br />Houston, TX77079-2943 <br />TBPE Registration No. F-312 <br />Andrew Moore, P.E. <br />TX P.E. # 124910 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.